The Committee on Transport and Tourism adopted the own-initiative report by Jacqueline FOSTER (ECR, UK) on the Implementation of the Single European Sky Legislation.
Timeframe: the report notes that 2012 is expected to be a pivotal year for the implementation of the SES. Whilst recognising the constraints that exist with regard to the implementation of the SES legislation, Members consider that it is necessary to build significantly on the progress made so far, laying down binding timeframes for the implementation of the SES but also taking account of business considerations. They underline the need to push ahead with the implementation of the SES legislation, as well as with the performance scheme for air navigation services and network functions in particular.
Noting that Europes airspace is among the busiest in the world, with over 750 million passengers using EU airports, and this figure is expected to double by 2030, the committee warns that the increase in air traffic means that Europes airspace is fast approaching its maximum capacity and that this problem needs to be urgently addressed. It also notes that maintaining Europes consistently high levels of safety and operational conditions is becoming more and more of a challenge, and urges Member States and the Commission to clarify the role of the relevant European bodies.
Members highlight the fact that in the Commissions latest communication on the subject it was estimated that there could be a cumulative impact on EU GDP of EUR 419 billion during the period 2013-2030 in the EU-27, with 328 000 jobs being created directly or indirectly and a net saving in CO2 emissions of some 50 million tonnes, if there is a full and timely deployment of the Single European Sky Air Traffic Management Research (SESAR) technology.
The timely introduction of SESAR will bring practical benefits for passengers, resulting in flight times being shortened by approximately 10% (or nine minutes), 50% fewer flight cancellations and delays, and a possible reduction in air fares. However, should the deployment of SESAR be delayed by ten years the overall impact would be catastrophic, since there would be a loss of around EUR 268 billion as a result of a reduced cumulative impact on EU GDP, with some 190 000 fewer jobs being created and some 55 million tonnes less saved in CO2 emissions.
The committee asks the Commission to report back:
Political input: the committee reminds Member States that the latter have publicly committed themselves to achieving the goal of a Single European Sky, and insists that they must remain proactive and involved in the implementation of this legislation. It calls on Member States to submit national performance plans in line with EU performance targets, and to adopt the revised performance targets proposed by the Commission, and it calls on the Commission to initiate appropriate action in case of failure to meet the deadlines for the implementation of this legislation.
Members regret the fact that despite its considerable social and environmental benefits the SES project is not sufficiently known or understood by the public, and invite the Commission, Member States and stakeholders to increase their public communication efforts.
Recalling that 4 December 2012 is the deadline for completion of implementation of Functional Airspace Blocks (FABs), but that the latest reports indicate that the situation is far from complying with this provision of the SES legislation, the committee remains extremely concerned that the creation of FABs across Europe is not only behind schedule but also lacks substance. It calls on the Commission to thoroughly monitor developments and, if necessary, take legal action, including sanctions, vis-à-vis Member States violating their obligations under the SES legislation. Members stress that without FABs the SES cannot be completed. The Commission is asked to:
Members feel that the most effective and efficient way of creating the SES is by means of a top-down approach, and therefore ask the Commission to propose measures to eliminate the consequences of the delay in the implementation of FABs, and to switch from the bottom-up to the top-down approach swiftly, in order to ensure that the objectives of the SES II legislative package are achieved.
Member States are asked to:
SESAR Deployment Strategy: Members acknowledge that there has been substantial financial investment by both industry and the EU in research and development for the SESAR technology, and believes it is now time to put in place the measures necessary to reap the benefits of that investment with the implementation of the SES legislation. Despite the requisite major investment, a number of important and tangible benefits stem from harmonisation, including flight optimisation, fuel efficiency, noise reduction, less air pollution and a reduced impact on climate change, as well as the flexible and safe use of a less fragmented sky. Members highlight the efficiency that greater civil-military coordination would achieve, since using joint infrastructure would result in cost-cutting; emphasises that enhanced interoperability between Member States and the realisation of FABs would also produce benefits in terms of cross border operations. Furthermore, technologies have already been developed by the manufacturers and are currently available, which makes the successful implementation of SESAR an achievable goal.
Members stress that the military community is a key actor in the SES context and should be fully involved at all levels and at a very early stage. They urge Member States to speed up their efforts to achieve coordination on the military side.
The Commission is asked to:
Lastly, the committee wants to strengthen the EDAs role in building political awareness, networking, assisting with the deployment phase of SESAR and supporting Member States in financial and operational risk analysis.
The Committee on Transport and Tourism adopted the own-initiative report by Jacqueline FOSTER (ECR, UK) on the Implementation of the Single European Sky Legislation.
Timeframe: the report notes that 2012 is expected to be a pivotal year for the implementation of the SES. Whilst recognising the constraints that exist with regard to the implementation of the SES legislation, Members consider that it is necessary to build significantly on the progress made so far, laying down binding timeframes for the implementation of the SES but also taking account of business considerations. They underline the need to push ahead with the implementation of the SES legislation, as well as with the performance scheme for air navigation services and network functions in particular.
Noting that Europes airspace is among the busiest in the world, with over 750 million passengers using EU airports, and this figure is expected to double by 2030, the committee warns that the increase in air traffic means that Europes airspace is fast approaching its maximum capacity and that this problem needs to be urgently addressed. It also notes that maintaining Europes consistently high levels of safety and operational conditions is becoming more and more of a challenge, and urges Member States and the Commission to clarify the role of the relevant European bodies.
Members highlight the fact that in the Commissions latest communication on the subject it was estimated that there could be a cumulative impact on EU GDP of EUR 419 billion during the period 2013-2030 in the EU-27, with 328 000 jobs being created directly or indirectly and a net saving in CO2 emissions of some 50 million tonnes, if there is a full and timely deployment of the Single European Sky Air Traffic Management Research (SESAR) technology.
The timely introduction of SESAR will bring practical benefits for passengers, resulting in flight times being shortened by approximately 10% (or nine minutes), 50% fewer flight cancellations and delays, and a possible reduction in air fares. However, should the deployment of SESAR be delayed by ten years the overall impact would be catastrophic, since there would be a loss of around EUR 268 billion as a result of a reduced cumulative impact on EU GDP, with some 190 000 fewer jobs being created and some 55 million tonnes less saved in CO2 emissions.
The committee asks the Commission to report back:
Political input: the committee reminds Member States that the latter have publicly committed themselves to achieving the goal of a Single European Sky, and insists that they must remain proactive and involved in the implementation of this legislation. It calls on Member States to submit national performance plans in line with EU performance targets, and to adopt the revised performance targets proposed by the Commission, and it calls on the Commission to initiate appropriate action in case of failure to meet the deadlines for the implementation of this legislation.
Members regret the fact that despite its considerable social and environmental benefits the SES project is not sufficiently known or understood by the public, and invite the Commission, Member States and stakeholders to increase their public communication efforts.
Recalling that 4 December 2012 is the deadline for completion of implementation of Functional Airspace Blocks (FABs), but that the latest reports indicate that the situation is far from complying with this provision of the SES legislation, the committee remains extremely concerned that the creation of FABs across Europe is not only behind schedule but also lacks substance. It calls on the Commission to thoroughly monitor developments and, if necessary, take legal action, including sanctions, vis-à-vis Member States violating their obligations under the SES legislation. Members stress that without FABs the SES cannot be completed. The Commission is asked to:
Members feel that the most effective and efficient way of creating the SES is by means of a top-down approach, and therefore ask the Commission to propose measures to eliminate the consequences of the delay in the implementation of FABs, and to switch from the bottom-up to the top-down approach swiftly, in order to ensure that the objectives of the SES II legislative package are achieved.
Member States are asked to:
SESAR Deployment Strategy: Members acknowledge that there has been substantial financial investment by both industry and the EU in research and development for the SESAR technology, and believes it is now time to put in place the measures necessary to reap the benefits of that investment with the implementation of the SES legislation. Despite the requisite major investment, a number of important and tangible benefits stem from harmonisation, including flight optimisation, fuel efficiency, noise reduction, less air pollution and a reduced impact on climate change, as well as the flexible and safe use of a less fragmented sky. Members highlight the efficiency that greater civil-military coordination would achieve, since using joint infrastructure would result in cost-cutting; emphasises that enhanced interoperability between Member States and the realisation of FABs would also produce benefits in terms of cross border operations. Furthermore, technologies have already been developed by the manufacturers and are currently available, which makes the successful implementation of SESAR an achievable goal.
Members stress that the military community is a key actor in the SES context and should be fully involved at all levels and at a very early stage. They urge Member States to speed up their efforts to achieve coordination on the military side.
The Commission is asked to:
Lastly, the committee wants to strengthen the EDAs role in building political awareness, networking, assisting with the deployment phase of SESAR and supporting Member States in financial and operational risk analysis.
PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.
BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.
But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.
CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.
(1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:
· all Member States have now established a National Supervisory Authority (NSA);
· the vast majority of the ANSPs have been certified and duly designated;
· a transparent charging system has been implemented;
· oversight of the airspace management and air traffic flow management takes place at national level; and
· the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.
Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:
· the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;
· insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;
· Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;
· although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.
The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.
(2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:
2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.
If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.
PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.
BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.
But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.
CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.
(1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:
· all Member States have now established a National Supervisory Authority (NSA);
· the vast majority of the ANSPs have been certified and duly designated;
· a transparent charging system has been implemented;
· oversight of the airspace management and air traffic flow management takes place at national level; and
· the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.
Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:
· the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;
· insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;
· Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;
· although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.
The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.
(2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:
2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.
If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.
PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.
BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.
But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.
CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.
(1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:
· all Member States have now established a National Supervisory Authority (NSA);
· the vast majority of the ANSPs have been certified and duly designated;
· a transparent charging system has been implemented;
· oversight of the airspace management and air traffic flow management takes place at national level; and
· the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.
Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:
· the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;
· insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;
· Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;
· although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.
The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.
(2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:
2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.
If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.
PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.
BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.
But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.
CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.
(1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:
· all Member States have now established a National Supervisory Authority (NSA);
· the vast majority of the ANSPs have been certified and duly designated;
· a transparent charging system has been implemented;
· oversight of the airspace management and air traffic flow management takes place at national level; and
· the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.
Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:
· the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;
· insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;
· Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;
· although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.
The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.
(2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:
2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.
If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.
OBJECTIF : présentation du rapport de la Commission sur la mise en uvre de la législation sur le ciel unique: le temps de la concrétisation.
CONTEXTE : à la suite du lancement de l'initiative «ciel unique européen» en 2000, la législation adoptée en 2004 (Règlement (CE) n° 549/2004) a fait entrer la gestion du trafic aérien dans le champ de compétence de l'Union européenne afin de réduire la fragmentation de l'espace aérien européen et d'accroître sa capacité. Désormais, le cadre institutionnel évolue; il existe des normes en matière de sécurité et d'interopérabilité ainsi que des règles relatives à la gestion de l'espace aérien et des courants de trafic aérien; la transparence des coûts, quant à elle, s'est améliorée.
Si le premier cadre législatif était nécessaire, il était néanmoins insuffisant. Par conséquent, un deuxième paquet législatif (ciel unique européen II) proposé par la Commission en juin 2008 a été adopté en novembre 2009 dans le but d'accélérer la mise en uvre d'un ciel réellement unique à partir de 2012. Il repose sur cinq piliers: les performances, la sécurité, la technologie, les aéroports et le facteur humain.
Ce deuxième paquet bénéficie d'un large soutien, non seulement des compagnies aériennes et des aéroports, mais aussi des prestataires de services de navigation aérienne. Cet appui politique fort confirme que la réforme en cours du secteur de la gestion du trafic aérien était urgente et qu'il convient de donner la priorité à la mise en uvre intégrale et dans les délais du ciel unique européen.
CONTENU : le présent rapport de la Commission fournit une vue d'ensemble de l'état d'avancement de la mise en uvre de la législation sur le ciel unique européen et des principales mesures prises (ou restant à prendre) depuis l'approbation du deuxième paquet en novembre 2009.
1) Mise en uvre du premier paquet législatif : compte tenu du nombre de mesures d'exécution à mettre en uvre, le rapport souligne que les États membres et les parties prenantes ont accompli un travail considérable depuis l'adoption du premier paquet législatif, en 2004. La mise en uvre de la législation sur le ciel unique européen a fait l'objet d'un suivi régulier. Les points suivants méritent d'être signalés:
Cependant, des efforts supplémentaires son nécessaires pour mettre en uvre pleinement et dans les délais la législation sur le ciel unique européen. Par exemple, Eurocontrol a émis 60 recommandations concernant les mesures concrètes que les États membres devraient prendre pour améliorer leur niveau de conformité ou les contrôles du niveau de conformité des prestataires de services de navigation aérienne. Plus particulièrement :
Les progrès accomplis dans certains domaines sont insuffisants, ce qui laisse supposer que plusieurs échéances de mise en uvre ne pourront pas être respectées. Les États membres doivent donc prendre des mesures correctrices. En octobre 2011, la Commission a adressé à chaque État membre un courrier en ce sens dans lequel elle expose les problèmes propres à chacun et insiste sur la nécessité de se conformer pleinement à la législation européenne, condition indispensable pour réussir la mise en uvre du deuxième paquet. Lorsque la non-conformité sera avérée et qu'aucune mesure correctrice n'aura été prise en temps voulu, la Commission examinera toutes les options à sa disposition, notamment l'ouverture de procédures d'infraction.
2) État davancement de la mise en uvre du deuxième paquet : l'architecture de base du «ciel unique européen II» (programme réglementaire et aspects organisationnels) a été mise en place conformément au calendrier initial. Tous les règlements et leurs principales mesures d'exécution en lien direct avec le ciel unique européen II ont été adoptés. De même, l'essentiel du nouveau cadre institutionnel est en place.
La Commission estime que le ciel unique européen ne sera un succès que si ses différentes composantes sont mises en uvre dans les délais. 2012 est donc une année charnière pour la mise en uvre du ciel unique européen. Priorité devrait être donnée aux actions qui contribuent le plus à l'amélioration des performances, en particulier :
Si le niveau des progrès accomplis à ce jour dans la mise en uvre du premier paquet législatif se situe en deçà des attentes initiales, la mise en uvre simultanée de mesures clés du deuxième paquet, qui débutera en 2012, devrait produire rapidement des effets bénéfiques importants. Les États membres sont invités à confirmer leurs engagements et à prendre des mesures à tous les niveaux afin de faire de ce processus un succès.
En particulier, l'Union doit mettre en place un système européen intégré de gestion du trafic aérien, un véritable réseau doté d'une structure de gouvernance unique et une capacité renforcée de surveillance et de réglementation.
Des mesures supplémentaires peuvent et doivent être développées, telles que l'extension du système de performance aux aéroports selon une véritable approche «porte à porte» et la gestion des investissements pour que le déploiement du programme SESAR contribue aux performances du ciel unique européen en tant que réseau. Une analyse d'impact sera menée le cas échéant.
PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.
BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.
But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.
CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.
(1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:
· all Member States have now established a National Supervisory Authority (NSA);
· the vast majority of the ANSPs have been certified and duly designated;
· a transparent charging system has been implemented;
· oversight of the airspace management and air traffic flow management takes place at national level; and
· the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.
Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:
· the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;
· insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;
· Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;
· although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.
The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.
(2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:
2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.
If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.
OBJECTIF : présentation du rapport de la Commission sur la mise en uvre de la législation sur le ciel unique: le temps de la concrétisation.
CONTEXTE : à la suite du lancement de l'initiative «ciel unique européen» en 2000, la législation adoptée en 2004 (Règlement (CE) n° 549/2004) a fait entrer la gestion du trafic aérien dans le champ de compétence de l'Union européenne afin de réduire la fragmentation de l'espace aérien européen et d'accroître sa capacité. Désormais, le cadre institutionnel évolue; il existe des normes en matière de sécurité et d'interopérabilité ainsi que des règles relatives à la gestion de l'espace aérien et des courants de trafic aérien; la transparence des coûts, quant à elle, s'est améliorée.
Si le premier cadre législatif était nécessaire, il était néanmoins insuffisant. Par conséquent, un deuxième paquet législatif (ciel unique européen II) proposé par la Commission en juin 2008 a été adopté en novembre 2009 dans le but d'accélérer la mise en uvre d'un ciel réellement unique à partir de 2012. Il repose sur cinq piliers: les performances, la sécurité, la technologie, les aéroports et le facteur humain.
Ce deuxième paquet bénéficie d'un large soutien, non seulement des compagnies aériennes et des aéroports, mais aussi des prestataires de services de navigation aérienne. Cet appui politique fort confirme que la réforme en cours du secteur de la gestion du trafic aérien était urgente et qu'il convient de donner la priorité à la mise en uvre intégrale et dans les délais du ciel unique européen.
CONTENU : le présent rapport de la Commission fournit une vue d'ensemble de l'état d'avancement de la mise en uvre de la législation sur le ciel unique européen et des principales mesures prises (ou restant à prendre) depuis l'approbation du deuxième paquet en novembre 2009.
1) Mise en uvre du premier paquet législatif : compte tenu du nombre de mesures d'exécution à mettre en uvre, le rapport souligne que les États membres et les parties prenantes ont accompli un travail considérable depuis l'adoption du premier paquet législatif, en 2004. La mise en uvre de la législation sur le ciel unique européen a fait l'objet d'un suivi régulier. Les points suivants méritent d'être signalés:
Cependant, des efforts supplémentaires son nécessaires pour mettre en uvre pleinement et dans les délais la législation sur le ciel unique européen. Par exemple, Eurocontrol a émis 60 recommandations concernant les mesures concrètes que les États membres devraient prendre pour améliorer leur niveau de conformité ou les contrôles du niveau de conformité des prestataires de services de navigation aérienne. Plus particulièrement :
Les progrès accomplis dans certains domaines sont insuffisants, ce qui laisse supposer que plusieurs échéances de mise en uvre ne pourront pas être respectées. Les États membres doivent donc prendre des mesures correctrices. En octobre 2011, la Commission a adressé à chaque État membre un courrier en ce sens dans lequel elle expose les problèmes propres à chacun et insiste sur la nécessité de se conformer pleinement à la législation européenne, condition indispensable pour réussir la mise en uvre du deuxième paquet. Lorsque la non-conformité sera avérée et qu'aucune mesure correctrice n'aura été prise en temps voulu, la Commission examinera toutes les options à sa disposition, notamment l'ouverture de procédures d'infraction.
2) État davancement de la mise en uvre du deuxième paquet : l'architecture de base du «ciel unique européen II» (programme réglementaire et aspects organisationnels) a été mise en place conformément au calendrier initial. Tous les règlements et leurs principales mesures d'exécution en lien direct avec le ciel unique européen II ont été adoptés. De même, l'essentiel du nouveau cadre institutionnel est en place.
La Commission estime que le ciel unique européen ne sera un succès que si ses différentes composantes sont mises en uvre dans les délais. 2012 est donc une année charnière pour la mise en uvre du ciel unique européen. Priorité devrait être donnée aux actions qui contribuent le plus à l'amélioration des performances, en particulier :
Si le niveau des progrès accomplis à ce jour dans la mise en uvre du premier paquet législatif se situe en deçà des attentes initiales, la mise en uvre simultanée de mesures clés du deuxième paquet, qui débutera en 2012, devrait produire rapidement des effets bénéfiques importants. Les États membres sont invités à confirmer leurs engagements et à prendre des mesures à tous les niveaux afin de faire de ce processus un succès.
En particulier, l'Union doit mettre en place un système européen intégré de gestion du trafic aérien, un véritable réseau doté d'une structure de gouvernance unique et une capacité renforcée de surveillance et de réglementation.
Des mesures supplémentaires peuvent et doivent être développées, telles que l'extension du système de performance aux aéroports selon une véritable approche «porte à porte» et la gestion des investissements pour que le déploiement du programme SESAR contribue aux performances du ciel unique européen en tant que réseau. Une analyse d'impact sera menée le cas échéant.
PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.
BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.
But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.
CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.
(1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:
· all Member States have now established a National Supervisory Authority (NSA);
· the vast majority of the ANSPs have been certified and duly designated;
· a transparent charging system has been implemented;
· oversight of the airspace management and air traffic flow management takes place at national level; and
· the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.
Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:
· the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;
· insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;
· Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;
· although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.
The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.
(2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:
2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.
If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.
PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.
BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.
But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.
CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.
(1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:
· all Member States have now established a National Supervisory Authority (NSA);
· the vast majority of the ANSPs have been certified and duly designated;
· a transparent charging system has been implemented;
· oversight of the airspace management and air traffic flow management takes place at national level; and
· the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.
Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:
· the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;
· insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;
· Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;
· although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.
The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.
(2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:
2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.
If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.
PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.
BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.
But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.
CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.
(1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:
· all Member States have now established a National Supervisory Authority (NSA);
· the vast majority of the ANSPs have been certified and duly designated;
· a transparent charging system has been implemented;
· oversight of the airspace management and air traffic flow management takes place at national level; and
· the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.
Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:
· the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;
· insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;
· Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;
· although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.
The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.
(2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:
2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.
If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.
PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.
BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.
But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.
CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.
(1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:
· all Member States have now established a National Supervisory Authority (NSA);
· the vast majority of the ANSPs have been certified and duly designated;
· a transparent charging system has been implemented;
· oversight of the airspace management and air traffic flow management takes place at national level; and
· the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.
Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:
· the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;
· insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;
· Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;
· although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.
The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.
(2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:
2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.
If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.
PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.
BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.
But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.
CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.
(1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:
· all Member States have now established a National Supervisory Authority (NSA);
· the vast majority of the ANSPs have been certified and duly designated;
· a transparent charging system has been implemented;
· oversight of the airspace management and air traffic flow management takes place at national level; and
· the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.
Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:
· the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;
· insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;
· Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;
· although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.
The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.
(2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:
2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.
If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.
PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.
BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.
But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.
CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.
(1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:
· all Member States have now established a National Supervisory Authority (NSA);
· the vast majority of the ANSPs have been certified and duly designated;
· a transparent charging system has been implemented;
· oversight of the airspace management and air traffic flow management takes place at national level; and
· the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.
Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:
· the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;
· insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;
· Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;
· although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.
The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.
(2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:
2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.
If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.