Parltrack watcher Feed - /dossier/2012/2005(INI) changes 2012-10-26T03:57:56 parltrack http://parltrack.euwiki.org/dossier/atom/2012/2005%28INI%29 2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewolddeletedactivities/8
date
2012-07-24
docs
  • url
    http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2012-254&language=EN
    text
    • The Committee on Transport and Tourism adopted the own-initiative report by Jacqueline FOSTER (ECR, UK) on the Implementation of the Single European Sky Legislation.

      Timeframe: the report notes that 2012 is expected to be a pivotal year for the implementation of the SES.  Whilst recognising the constraints that exist with regard to the implementation of the SES legislation, Members consider that it is necessary to build significantly on the progress made so far, laying down binding timeframes for the implementation of the SES but also taking account of business considerations. They underline the need to push ahead with the implementation of the SES legislation, as well as with the performance scheme for air navigation services and network functions in particular.

      Noting that Europe’s airspace is among the busiest in the world, with over 750 million passengers using EU airports, and this figure is expected to double by 2030, the committee warns that the increase in air traffic means that Europe’s airspace is fast approaching its maximum capacity and that this problem needs to be urgently addressed. It also notes that maintaining Europe’s consistently high levels of safety and operational conditions is becoming more and more of a challenge, and urges Member States and the Commission to clarify the role of the relevant European bodies.

      Members highlight the fact that in the Commission’s latest communication on the subject it was estimated that there could be a cumulative impact on EU GDP of EUR 419 billion during the period 2013-2030 in the EU-27, with 328 000 jobs being created directly or indirectly and a net saving in CO2 emissions of some 50 million tonnes, if there is a full and timely deployment of the Single European Sky Air Traffic Management Research (SESAR) technology.

      The timely introduction of SESAR will bring practical benefits for passengers, resulting in flight times being shortened by approximately 10% (or nine minutes), 50% fewer flight cancellations and delays, and a possible reduction in air fares. However, should the deployment of SESAR be delayed by ten years the overall impact would be catastrophic, since there would be a loss of around EUR 268 billion as a result of a reduced cumulative impact on EU GDP, with some 190 000 fewer jobs being created and some 55 million tonnes less saved in CO2 emissions.

      The committee asks the Commission to report back:

      • on the progress made towards the implementation of the performance scheme by all Air Navigation Service Providers (ANSPs) by December 2012;
      • on the progress made with regard to the implementation of the SES legislation by March 2013, including an evaluation of the consequences of the delays in implementing the Functional Airspace Blocks (FAB)s.

      Political input: the committee reminds Member States that the latter have publicly committed themselves to achieving the goal of a Single European Sky, and insists that they must remain proactive and involved in the implementation of this legislation. It calls on Member States to submit national performance plans in line with EU performance targets, and to adopt the revised performance targets proposed by the Commission, and it calls on the Commission to initiate appropriate action in case of failure to meet the deadlines for the implementation of this legislation.

      Members regret the fact that despite its considerable social and environmental benefits the SES project is not sufficiently known or understood by the public, and invite the Commission, Member States and stakeholders to increase their public communication efforts.

      Recalling that 4 December 2012 is the deadline for completion of implementation of Functional Airspace Blocks (FABs), but that the latest reports indicate that the situation is far from complying with this provision of the SES legislation, the committee remains extremely concerned that the creation of FABs across Europe is not only behind schedule but also lacks substance. It calls on the Commission to thoroughly monitor developments and, if necessary, take legal action, including sanctions, vis-à-vis Member States violating their obligations under the SES legislation. Members stress that without FABs the SES cannot be completed. The Commission is asked to:

      • propose a strategy to accelerate the implementation of the FABs which includes the full implementation of centralised models (e.g. Network Manager, SESAR Joint Undertaking, Deployment Manager);
      • make greater use of its cautioning methods, and, should these not succeed, take out infringement proceedings against those Member States which have not yet signed the agreements for establishing their FABs.

      Members feel that the most effective and efficient way of creating the SES is by means of a top-down approach, and therefore ask the Commission to propose measures to eliminate the consequences of the delay in the implementation of FABs, and to switch from the bottom-up to the top-down approach swiftly, in order to ensure that the objectives of the SES II legislative package are achieved.

      Member States are asked to:

      • ensure that the issue of lack of resources, especially with regard to the National Supervisory Authority, is addressed swiftly at national political level;
      • provide the necessary funding as soon as possible for the completion of the SES.

      SESAR Deployment Strategy: Members acknowledge that there has been substantial financial investment by both industry and the EU in research and development for the SESAR technology, and believes it is now time to put in place the measures necessary to reap the benefits of that investment with the implementation of the SES legislation. Despite the requisite major investment, a number of important and tangible benefits stem from harmonisation, including flight optimisation, fuel efficiency, noise reduction, less air pollution and a reduced impact on climate change, as well as the flexible and safe use of a less fragmented sky. Members highlight the efficiency that greater civil-military coordination would achieve, since using joint infrastructure would result in cost-cutting; emphasises that enhanced interoperability between Member States and the realisation of FABs would also produce benefits in terms of cross border operations. Furthermore, technologies have already been developed by the manufacturers and are currently available, which makes the successful implementation of SESAR an achievable goal.

      Members stress that the military community is a key actor in the SES context and should be fully involved at all levels and at a very early stage. They urge Member States to speed up their efforts to achieve coordination on the military side.

      The Commission is asked to:

      • prepare a legislative proposal on the future role of the SESAR Joint Undertaking in good time, as it has a vital part to play in ensuring the success of the SES;
      • rapidly to set up the governance, incentive and financial mechanisms, including public funding, that are needed to ensure the timely and effective deployment of SESAR technologies, involving the relevant authorities and stakeholders and paying particular attention to the implementation of innovative financial instruments;

      Lastly, the committee wants to strengthen the EDA’s role in building political awareness, networking, assisting with the deployment phase of SESAR and supporting Member States in financial and operational risk analysis.

    type
    Committee report tabled for plenary, single reading
    title
    A7-0254/2012
body
EP
type
Committee report tabled for plenary, single reading
changeactivities/8/bodyEPEC deletedactivities/8/commission
  • DG
    Commissioner
    KALLAS Siim
changeactivities/8/date2012-07-242012-10-22 addedactivities/8/docs
  • url
    http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2012-254&language=EN
    text
    • The Committee on Transport and Tourism adopted the own-initiative report by Jacqueline FOSTER (ECR, UK) on the Implementation of the Single European Sky Legislation.

      Timeframe: the report notes that 2012 is expected to be a pivotal year for the implementation of the SES.  Whilst recognising the constraints that exist with regard to the implementation of the SES legislation, Members consider that it is necessary to build significantly on the progress made so far, laying down binding timeframes for the implementation of the SES but also taking account of business considerations. They underline the need to push ahead with the implementation of the SES legislation, as well as with the performance scheme for air navigation services and network functions in particular.

      Noting that Europe’s airspace is among the busiest in the world, with over 750 million passengers using EU airports, and this figure is expected to double by 2030, the committee warns that the increase in air traffic means that Europe’s airspace is fast approaching its maximum capacity and that this problem needs to be urgently addressed. It also notes that maintaining Europe’s consistently high levels of safety and operational conditions is becoming more and more of a challenge, and urges Member States and the Commission to clarify the role of the relevant European bodies.

      Members highlight the fact that in the Commission’s latest communication on the subject it was estimated that there could be a cumulative impact on EU GDP of EUR 419 billion during the period 2013-2030 in the EU-27, with 328 000 jobs being created directly or indirectly and a net saving in CO2 emissions of some 50 million tonnes, if there is a full and timely deployment of the Single European Sky Air Traffic Management Research (SESAR) technology.

      The timely introduction of SESAR will bring practical benefits for passengers, resulting in flight times being shortened by approximately 10% (or nine minutes), 50% fewer flight cancellations and delays, and a possible reduction in air fares. However, should the deployment of SESAR be delayed by ten years the overall impact would be catastrophic, since there would be a loss of around EUR 268 billion as a result of a reduced cumulative impact on EU GDP, with some 190 000 fewer jobs being created and some 55 million tonnes less saved in CO2 emissions.

      The committee asks the Commission to report back:

      • on the progress made towards the implementation of the performance scheme by all Air Navigation Service Providers (ANSPs) by December 2012;
      • on the progress made with regard to the implementation of the SES legislation by March 2013, including an evaluation of the consequences of the delays in implementing the Functional Airspace Blocks (FAB)s.

      Political input: the committee reminds Member States that the latter have publicly committed themselves to achieving the goal of a Single European Sky, and insists that they must remain proactive and involved in the implementation of this legislation. It calls on Member States to submit national performance plans in line with EU performance targets, and to adopt the revised performance targets proposed by the Commission, and it calls on the Commission to initiate appropriate action in case of failure to meet the deadlines for the implementation of this legislation.

      Members regret the fact that despite its considerable social and environmental benefits the SES project is not sufficiently known or understood by the public, and invite the Commission, Member States and stakeholders to increase their public communication efforts.

      Recalling that 4 December 2012 is the deadline for completion of implementation of Functional Airspace Blocks (FABs), but that the latest reports indicate that the situation is far from complying with this provision of the SES legislation, the committee remains extremely concerned that the creation of FABs across Europe is not only behind schedule but also lacks substance. It calls on the Commission to thoroughly monitor developments and, if necessary, take legal action, including sanctions, vis-à-vis Member States violating their obligations under the SES legislation. Members stress that without FABs the SES cannot be completed. The Commission is asked to:

      • propose a strategy to accelerate the implementation of the FABs which includes the full implementation of centralised models (e.g. Network Manager, SESAR Joint Undertaking, Deployment Manager);
      • make greater use of its cautioning methods, and, should these not succeed, take out infringement proceedings against those Member States which have not yet signed the agreements for establishing their FABs.

      Members feel that the most effective and efficient way of creating the SES is by means of a top-down approach, and therefore ask the Commission to propose measures to eliminate the consequences of the delay in the implementation of FABs, and to switch from the bottom-up to the top-down approach swiftly, in order to ensure that the objectives of the SES II legislative package are achieved.

      Member States are asked to:

      • ensure that the issue of lack of resources, especially with regard to the National Supervisory Authority, is addressed swiftly at national political level;
      • provide the necessary funding as soon as possible for the completion of the SES.

      SESAR Deployment Strategy: Members acknowledge that there has been substantial financial investment by both industry and the EU in research and development for the SESAR technology, and believes it is now time to put in place the measures necessary to reap the benefits of that investment with the implementation of the SES legislation. Despite the requisite major investment, a number of important and tangible benefits stem from harmonisation, including flight optimisation, fuel efficiency, noise reduction, less air pollution and a reduced impact on climate change, as well as the flexible and safe use of a less fragmented sky. Members highlight the efficiency that greater civil-military coordination would achieve, since using joint infrastructure would result in cost-cutting; emphasises that enhanced interoperability between Member States and the realisation of FABs would also produce benefits in terms of cross border operations. Furthermore, technologies have already been developed by the manufacturers and are currently available, which makes the successful implementation of SESAR an achievable goal.

      Members stress that the military community is a key actor in the SES context and should be fully involved at all levels and at a very early stage. They urge Member States to speed up their efforts to achieve coordination on the military side.

      The Commission is asked to:

      • prepare a legislative proposal on the future role of the SESAR Joint Undertaking in good time, as it has a vital part to play in ensuring the success of the SES;
      • rapidly to set up the governance, incentive and financial mechanisms, including public funding, that are needed to ensure the timely and effective deployment of SESAR technologies, involving the relevant authorities and stakeholders and paying particular attention to the implementation of innovative financial instruments;

      Lastly, the committee wants to strengthen the EDA’s role in building political awareness, networking, assisting with the deployment phase of SESAR and supporting Member States in financial and operational risk analysis.

    type
    Committee report tabled for plenary, single reading
    title
    A7-0254/2012
changeactivities/8/typeCommittee report tabled for plenary, single readingPrev DG PRES addedactivities/10/docs
  • type
    Decision by Parliament, 1st reading/single reading
    title
    T7-0370/2012
changeactivities/10/typeText adopted by Parliament, single readingVote scheduled changeprocedure/stage_reachedProcedure completedAwaiting Parliament 1st reading / single reading / budget 1st stage ]]>
2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldchangeactivities/9/typeDebate in ParliamentDebate scheduled ]]> 2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldsummary changedactivities/1/docs/0/text/0 changeactivities/1/typeNon-legislative basic documentFollow-up document ]]> 2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldsummary changedactivities/1/docs/0/text/0 changeactivities/1/typeFollow-up documentNon-legislative basic document ]]> 2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldchangeactivities/9/typeDebate scheduledEP 1R Plenary addedactivities/11
date
2012-10-23
body
EP
type
Vote scheduled
]]>
2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldchangeactivities/9/date2012-10-222012-10-25 changeactivities/9/typeEP 1R PlenaryIndicative plenary sitting date, 1st reading/single reading addedactivities/10
body
EC
date
2012-10-22
type
Prev DG PRES
commission
  • DG
    Commissioner
    KALLAS Siim
]]>
2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldaddedactivities/6
date
2012-06-08
docs
  • url
    http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE491.198
    type
    Amendments tabled in committee
    title
    PE491.198
body
EP
type
Amendments tabled in committee
]]>
2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewolddeletedactivities/1
date
2011-11-14
docs
  • url
    http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=731
    text
    • PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.

      BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.

      But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.

      CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.

      (1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:

      ·        all Member States have now established a National Supervisory Authority (NSA);

      ·        the vast majority of the ANSPs have been certified and duly designated;

      ·        a transparent charging system has been implemented;

      ·        oversight of the airspace management and air traffic flow management takes place at national level; and

      ·        the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.

      Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:

      ·        the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;

      ·        insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;

      ·        Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities – which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;

      ·        although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.

      The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.

      (2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:

      • in particular the performance scheme (starting early in 2012);
      • the FABs (to be operational by end 2012),
      • the network functions (already in place) and
      • the deployment of the SESAR programme (to start in 2014).

      2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.

      If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.

    celexid
    CELEX:52011DC0731:EN
    type
    Non-legislative basic document published
    title
    COM(2011)0731
body
EC
commission
  • DG
    Commissioner
    KALLAS Siim
type
Non-legislative basic document
changeactivities/1/date2011-11-142012-10-23 addedactivities/1/docs
  • url
    http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=731
    text
    • PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.

      BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.

      But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.

      CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.

      (1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:

      ·        all Member States have now established a National Supervisory Authority (NSA);

      ·        the vast majority of the ANSPs have been certified and duly designated;

      ·        a transparent charging system has been implemented;

      ·        oversight of the airspace management and air traffic flow management takes place at national level; and

      ·        the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.

      Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:

      ·        the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;

      ·        insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;

      ·        Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities – which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;

      ·        although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.

      The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.

      (2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:

      • in particular the performance scheme (starting early in 2012);
      • the FABs (to be operational by end 2012),
      • the network functions (already in place) and
      • the deployment of the SESAR programme (to start in 2014).

      2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.

      If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.

    title
    COM(2011)0731
    type
    Non-legislative basic document published
    celexid
    CELEX:52011DC0731:EN
changeactivities/1/typeNon-legislative basic documentPrev DG PRES deletedactivities/8
body
EP
date
2012-10-23
type
EP 1R Plenary
]]>
2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldsummary changedactivities/7/docs/0/text changeactivities/8/typeEP 1R PlenaryIndicative plenary sitting date, 1st reading/single reading addedactivities/9
body
EC
date
2012-10-23
type
Prev DG PRES
commission
  • DG
    Commissioner
    KALLAS Siim
addedactivities/10
date
2012-10-25
body
EP
type
Indicative plenary sitting date, 1st reading/single reading
]]>
2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldaddedactivities/7/docs/0/urlhttp://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2012-254&language=EN ]]> 2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewolddeletedactivities/1
date
2011-11-14
docs
  • url
    http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=731
    text
    • PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.

      BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.

      But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.

      CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.

      (1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:

      ·        all Member States have now established a National Supervisory Authority (NSA);

      ·        the vast majority of the ANSPs have been certified and duly designated;

      ·        a transparent charging system has been implemented;

      ·        oversight of the airspace management and air traffic flow management takes place at national level; and

      ·        the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.

      Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:

      ·        the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;

      ·        insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;

      ·        Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities – which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;

      ·        although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.

      The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.

      (2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:

      • in particular the performance scheme (starting early in 2012);
      • the FABs (to be operational by end 2012),
      • the network functions (already in place) and
      • the deployment of the SESAR programme (to start in 2014).

      2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.

      If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.

    title
    COM(2011)0731
    type
    Non-legislative basic document published
    celexid
    CELEX:52011DC0731:EN
body
EC
commission
  • DG
    Commissioner
    KALLAS Siim
type
Non-legislative basic document
changeactivities/1/date2011-11-142012-09-10 addedactivities/1/docs
  • url
    http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=731
    text
    • PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.

      BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.

      But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.

      CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.

      (1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:

      ·        all Member States have now established a National Supervisory Authority (NSA);

      ·        the vast majority of the ANSPs have been certified and duly designated;

      ·        a transparent charging system has been implemented;

      ·        oversight of the airspace management and air traffic flow management takes place at national level; and

      ·        the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.

      Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:

      ·        the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;

      ·        insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;

      ·        Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities – which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;

      ·        although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.

      The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.

      (2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:

      • in particular the performance scheme (starting early in 2012);
      • the FABs (to be operational by end 2012),
      • the network functions (already in place) and
      • the deployment of the SESAR programme (to start in 2014).

      2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.

      If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.

    celexid
    CELEX:52011DC0731:EN
    type
    Non-legislative basic document published
    title
    COM(2011)0731
changeactivities/1/typeNon-legislative basic documentPrev DG PRES changeactivities/8/date2012-10-232012-09-10 changeactivities/8/typeIndicative plenary sitting date, 1st reading/single readingEP 1R Plenary ]]>
2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldaddedactivities/7
date
2012-07-24
docs
  • type
    Committee report tabled for plenary, single reading
    title
    A7-0254/2012
body
EP
type
Committee report tabled for plenary, single reading
]]>
2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldaddedactivities/6/committees
  • body
    EP
    responsible
    False
    committee
    AFET
    date
    2012-03-06
    committee_full
    Foreign Affairs
    rapporteur
    • group
      S&D
      name
      KIRILOV Evgeni
  • body
    EP
    responsible
    False
    committee_full
    Employment and Social Affairs
    committee
    EMPL
  • body
    EP
    responsible
    False
    committee_full
    Internal Market and Consumer Protection
    committee
    IMCO
  • body
    EP
    responsible
    False
    committee_full
    Legal Affairs
    committee
    JURI
  • body
    EP
    shadows
    responsible
    True
    committee
    TRAN
    date
    2012-01-12
    committee_full
    Transport and Tourism
    rapporteur
    • group
      ECR
      name
      FOSTER Jacqueline
changeactivities/6/typeVote in committee, 1st reading/single readingPrev Adopt in Cte ]]>
2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldchangeactivities/7/typeEP 1R PlenaryIndicative plenary sitting date, 1st reading/single reading addedactivities/8
body
EC
date
2012-09-10
type
Prev DG PRES
commission
  • DG
    Commissioner
    KALLAS Siim
addedprocedure/legal_basis
  • Rules of Procedure of the European Parliament EP 048
]]>
2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldaddedactivities/6
body
EP
date
2012-07-10
type
Prev Adopt in Cte
]]>
2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldaddedactivities/5
body
EP
date
2012-06-07
type
Deadline Amendments
changeactivities/6/date2012-09-102012-09-11 ]]>
2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldaddedactivities/4/docs/0/urlhttp://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE483.494 deletedprocedure/legal_basis
  • Rules of Procedure of the European Parliament EP 048
]]>
2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldaddedactivities/4
date
2012-04-25
docs
  • type
    Committee draft report
    title
    PE483.494
body
EP
type
Committee draft report
]]>
2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldaddedactivities/1/docs/0/urlhttp://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=731 ]]> 2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewolddeletedactivities/1/docs/0/urlhttp://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=731 ]]> 2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldsummary changedactivities/1/docs/0/text/0 addedactivities/1/docs/0/urlhttp://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=731 changeactivities/1/typeNon-legislative basic documentFollow-up document ]]> 2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldsummary changedactivities/1/docs/0/text/0 changeactivities/1/typeFollow-up documentNon-legislative basic document ]]> 2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewolddeletedactivities/1/docs/0/urlhttp://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=731 ]]> 2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldaddedactivities/1/docs/0/urlhttp://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=731 ]]> 2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewolddeletedactivities/1/docs/0/urlhttp://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=731 addedactivities/3/committees/0/date2012-03-06 addedactivities/3/committees/0/rapporteur
  • group
    S&D
    name
    KIRILOV Evgeni
addedcommittees/0/date2012-03-06 addedcommittees/0/rapporteur
  • group
    S&D
    name
    KIRILOV Evgeni
]]>
2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldaddedactivities/1/docs/0/celexidCELEX:52011DC0731:EN ]]> 2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewolddeletedactivities/1/docs/0/celexidCELEX:52011DC0731:EN addedactivities/3/committees/0
body
EP
responsible
False
committee_full
Foreign Affairs
committee
AFET
addedcommittees/0
body
EP
responsible
False
committee_full
Foreign Affairs
committee
AFET
]]>
2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldaddedactivities/3/committees/3/shadows/3
group
Verts/ALE
name
LICHTENBERGER Eva
addedcommittees/3/shadows/3
group
Verts/ALE
name
LICHTENBERGER Eva
]]>
2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldsummary changedactivities/1/docs/0/text changeactivities/1/typeNon-legislative basic documentNon-legislative basic document published ]]> 2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldsummary changedactivities/1/docs/0/text changeactivities/1/typeNon-legislative basic document publishedNon-legislative basic document ]]> 2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldchangeactivities/1/docs/0/urlhttp://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=731http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=0731 ]]> 2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldaddedactivities/3/committees/3/shadows/1
group
S&D
name
DANELLIS Spyros
addedcommittees/3/shadows/1
group
S&D
name
DANELLIS Spyros
]]>
2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewolddeletedactivities/0
date
2011-11-14
docs
  • url
    http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=FR&type_doc=COMfinal&an_doc=2011&nu_doc=0731
    text
    • OBJECTIF : présentation du rapport de la Commission sur la mise en œuvre de la législation sur le ciel unique: le temps de la concrétisation.

      CONTEXTE : à la suite du lancement de l'initiative «ciel unique européen» en 2000, la législation adoptée en 2004 (Règlement (CE) n° 549/2004) a fait entrer la gestion du trafic aérien dans le champ de compétence de l'Union européenne afin de réduire la fragmentation de l'espace aérien européen et d'accroître sa capacité. Désormais, le cadre institutionnel évolue; il existe des normes en matière de sécurité et d'interopérabilité ainsi que des règles relatives à la gestion de l'espace aérien et des courants de trafic aérien; la transparence des coûts, quant à elle, s'est améliorée.

      Si le premier cadre législatif était nécessaire, il était néanmoins insuffisant. Par conséquent, un deuxième paquet législatif (ciel unique européen II) proposé par la Commission en juin 2008 a été adopté en novembre 2009 dans le but d'accélérer la mise en œuvre d'un ciel réellement unique à partir de 2012. Il repose sur cinq piliers: les performances, la sécurité, la technologie, les aéroports et le facteur humain.

      Ce deuxième paquet bénéficie d'un large soutien, non seulement des compagnies aériennes et des aéroports, mais aussi des prestataires de services de navigation aérienne. Cet appui politique fort confirme que la réforme en cours du secteur de la gestion du trafic aérien était urgente et qu'il convient de donner la priorité à la mise en œuvre intégrale et dans les délais du ciel unique européen.

      CONTENU : le présent rapport de la Commission fournit une vue d'ensemble de l'état d'avancement de la mise en œuvre de la législation sur le ciel unique européen et des principales mesures prises (ou restant à prendre) depuis l'approbation du deuxième paquet en novembre 2009.

      1) Mise en œuvre du premier paquet législatif : compte tenu du nombre de mesures d'exécution à mettre en œuvre, le rapport souligne que les États membres et les parties prenantes ont accompli un travail considérable depuis l'adoption du premier paquet législatif, en 2004. La mise en œuvre de la législation sur le ciel unique européen a fait l'objet d'un suivi régulier. Les points suivants méritent d'être signalés:

      • tous les États membres ont maintenant mis en place leur autorité de surveillance nationale (ASN);
      • la grande majorité des prestataires de services de navigation aérienne ont été certifiés et dûment désignés;
      • un système de tarification transparent a vu le jour;
      • la surveillance de la gestion de l'espace aérien et des courants de trafic aérien s'exerce au niveau national ;
      • le comité du ciel unique et l'organe consultatif de branche jouent pleinement leur rôle au niveau de l'UE.

      Cependant, des efforts supplémentaires son nécessaires pour mettre en œuvre pleinement et dans les délais la législation sur le ciel unique européen. Par exemple, Eurocontrol a émis 60 recommandations concernant les mesures concrètes que les États membres devraient prendre pour améliorer leur niveau de conformité ou les contrôles du niveau de conformité des prestataires de services de navigation aérienne. Plus particulièrement :

      • le manque de ressources des ASN pour exercer une surveillance efficace dans tous les domaines, notamment la sécurité, l'interopérabilité et les performances, est une source de préoccupation majeure qu'il convient de traiter rapidement au niveau politique national ; les solutions pour remédier à ces problèmes sont bien connues (coopération, délégation et/ou externalisation notamment);
      • les mesures prises au niveau des États membres et des ASN pour garantir une surveillance adéquate de la prestation transfrontalière de services de navigation aérienne sont insuffisantes ; les États membres doivent veiller à ce que la base juridique de la prestation transfrontalière des services de navigation aérienne soit correctement établie sur leur territoire ;
      • la mise en œuvre du règlement (CE) nº 552/2004 sur l'interopérabilité est insuffisante : sept ans après l'adoption du règlement de base, environ un tiers des ASN n'ont pas vérifié de manière appropriée la capacité des prestataires de services de navigation aérienne à mener des activités d'évaluation de la conformité ;
      • enfin, bien que les États membres aient progressé dans l'application du concept de gestion souple de l'espace aérien, ils doivent redoubler d'efforts pour améliorer son efficacité, notamment en ce qui concerne le suivi des performances.

      Les progrès accomplis dans certains domaines sont insuffisants, ce qui laisse supposer que plusieurs échéances de mise en œuvre ne pourront pas être respectées. Les États membres doivent donc prendre des mesures correctrices. En octobre 2011, la Commission a adressé à chaque État membre un courrier en ce sens dans lequel elle expose les problèmes propres à chacun et insiste sur la nécessité de se conformer pleinement à la législation européenne, condition indispensable pour réussir la mise en œuvre du deuxième paquet. Lorsque la non-conformité sera avérée et qu'aucune mesure correctrice n'aura été prise en temps voulu, la Commission examinera toutes les options à sa disposition, notamment l'ouverture de procédures d'infraction.

      2) État d’avancement de la mise en œuvre du deuxième paquet : l'architecture de base du «ciel unique européen II» (programme réglementaire et aspects organisationnels) a été mise en place conformément au calendrier initial. Tous les règlements et leurs principales mesures d'exécution en lien direct avec le ciel unique européen II ont été adoptés. De même, l'essentiel du nouveau cadre institutionnel est en place.

      La Commission estime que le ciel unique européen ne sera un succès que si ses différentes composantes sont mises en œuvre dans les délais. 2012 est donc une année charnière pour la mise en œuvre du ciel unique européen. Priorité devrait être donnée aux actions qui contribuent le plus à l'amélioration des performances, en particulier :

      • le «système de performance» (qui débutera au début de 2012),
      • les blocs d'espace aérien fonctionnels (qui seront opérationnels d'ici à fin 2012),
      • les fonctions de réseau (déjà en place) et
      • le déploiement du programme SESAR (à partir de 2014).

      Si le niveau des progrès accomplis à ce jour dans la mise en œuvre du premier paquet législatif se situe en deçà des attentes initiales, la mise en œuvre simultanée de mesures clés du deuxième paquet, qui débutera en 2012, devrait produire rapidement des effets bénéfiques importants. Les États membres sont invités à confirmer leurs engagements et à prendre des mesures à tous les niveaux afin de faire de ce processus un succès.

      En particulier, l'Union doit mettre en place un système européen intégré de gestion du trafic aérien, un véritable réseau doté d'une structure de gouvernance unique et une capacité renforcée de surveillance et de réglementation.

      Des mesures supplémentaires peuvent et doivent être développées, telles que l'extension du système de performance aux aéroports selon une véritable approche «porte à porte» et la gestion des investissements pour que le déploiement du programme SESAR contribue aux performances du ciel unique européen en tant que réseau. Une analyse d'impact sera menée le cas échéant.  

    celexid
    CELEX:52011DC0731:EN
    type
    Publication du document de base non-législatif
    title
    COM(2011)0731
body
unknown
type
Publication du document de base non-législatif
addedactivities/1
date
2011-11-14
docs
  • url
    http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=0731
    text
    • PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.

      BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.

      But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.

      CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.

      (1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:

      ·        all Member States have now established a National Supervisory Authority (NSA);

      ·        the vast majority of the ANSPs have been certified and duly designated;

      ·        a transparent charging system has been implemented;

      ·        oversight of the airspace management and air traffic flow management takes place at national level; and

      ·        the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.

      Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:

      ·        the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;

      ·        insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;

      ·        Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities – which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;

      ·        although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.

      The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.

      (2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:

      • in particular the performance scheme (starting early in 2012);
      • the FABs (to be operational by end 2012),
      • the network functions (already in place) and
      • the deployment of the SESAR programme (to start in 2014).

      2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.

      If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.

    celexid
    CELEX:52011DC0731:EN
    type
    Non-legislative basic document published
    title
    COM(2011)0731
body
EC
type
Non-legislative basic document
commission
  • DG
    Commissioner
    KALLAS Siim
addedactivities/3
date
2012-01-19
body
EP
type
Committee referral announced in Parliament, 1st reading/single reading
committees
deletedactivities/3
date
2012-01-19
body
unknown
type
Annonce en plénière de la saisine de la commission, 1ère lecture/lecture unique
addedactivities/4
date
2012-09-11
body
EP
type
Indicative plenary sitting date, 1st reading/single reading
deletedactivities/4
date
2012-09-11
body
unknown
type
Date indicative de la séance plénière, 1ère lecture/lecture unique
deletedactivities/5
body
EP
date
2012-09-11
type
EP 1R Plenary
deletedactivities/6
body
EC
date
2012-09-11
type
Prev DG PRES
commission
    addedcommittees/0
    body
    EP
    responsible
    False
    committee_full
    Employment and Social Affairs
    committee
    EMPL
    addedcommittees/1
    body
    EP
    responsible
    False
    committee_full
    Internal Market and Consumer Protection
    committee
    IMCO
    addedcommittees/2
    body
    EP
    responsible
    False
    committee_full
    Legal Affairs
    committee
    JURI
    addedcommittees/3
    body
    EP
    shadows
    responsible
    True
    committee
    TRAN
    date
    2012-01-12
    committee_full
    Transport and Tourism
    rapporteur
    • group
      ECR
      name
      FOSTER Jacqueline
    addedother/0
    body
    EC
    dg
    commissioner
    KALLAS Siim
    deletedprocedure/Base juridiqueRèglement du Parlement européen EP 048 deletedprocedure/Dossier de la commission parlementaireTRAN/7/08576 deletedprocedure/Etape de la procédureEn attente de la 1ère lecture du Parlement / lecture unique / 1ère phase du budget deletedprocedure/Référence de procédure2012/2005(INI) deletedprocedure/Sous-type de procédureRapport d’initiative deletedprocedure/Type de procédureINI - Procédure d'initiative addedprocedure/dossier_of_the_committeeTRAN/7/08576 addedprocedure/legal_basis
    • Rules of Procedure of the European Parliament EP 048
    changeprocedure/stage_reachedAwaiting Parliament 1st reading / single reading / budget 1st stageEn attente de la 1ère lecture du Parlement / lecture unique / 1ère phase du budget addedprocedure/subject
    • 3.20.01 Air transport and air freight
    • 8.50.01 Implementation of Community law
    addedprocedure/subtypeInitiative deletedprocedure/sujet
    • 3.20.01 Transport aérien de personnes et frêt
    • 8.50.01 Application du droit communautaire
    changeprocedure/titleImplementation of the Single European Sky legislationMise en œuvre de la législation sur le ciel unique européen changeprocedure/typeINI - Own-initiative procedureINI - Procédure d'initiative ]]>
    2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldaddedactivities/0
    date
    2011-11-14
    docs
    • url
      http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=FR&type_doc=COMfinal&an_doc=2011&nu_doc=0731
      text
      • OBJECTIF : présentation du rapport de la Commission sur la mise en œuvre de la législation sur le ciel unique: le temps de la concrétisation.

        CONTEXTE : à la suite du lancement de l'initiative «ciel unique européen» en 2000, la législation adoptée en 2004 (Règlement (CE) n° 549/2004) a fait entrer la gestion du trafic aérien dans le champ de compétence de l'Union européenne afin de réduire la fragmentation de l'espace aérien européen et d'accroître sa capacité. Désormais, le cadre institutionnel évolue; il existe des normes en matière de sécurité et d'interopérabilité ainsi que des règles relatives à la gestion de l'espace aérien et des courants de trafic aérien; la transparence des coûts, quant à elle, s'est améliorée.

        Si le premier cadre législatif était nécessaire, il était néanmoins insuffisant. Par conséquent, un deuxième paquet législatif (ciel unique européen II) proposé par la Commission en juin 2008 a été adopté en novembre 2009 dans le but d'accélérer la mise en œuvre d'un ciel réellement unique à partir de 2012. Il repose sur cinq piliers: les performances, la sécurité, la technologie, les aéroports et le facteur humain.

        Ce deuxième paquet bénéficie d'un large soutien, non seulement des compagnies aériennes et des aéroports, mais aussi des prestataires de services de navigation aérienne. Cet appui politique fort confirme que la réforme en cours du secteur de la gestion du trafic aérien était urgente et qu'il convient de donner la priorité à la mise en œuvre intégrale et dans les délais du ciel unique européen.

        CONTENU : le présent rapport de la Commission fournit une vue d'ensemble de l'état d'avancement de la mise en œuvre de la législation sur le ciel unique européen et des principales mesures prises (ou restant à prendre) depuis l'approbation du deuxième paquet en novembre 2009.

        1) Mise en œuvre du premier paquet législatif : compte tenu du nombre de mesures d'exécution à mettre en œuvre, le rapport souligne que les États membres et les parties prenantes ont accompli un travail considérable depuis l'adoption du premier paquet législatif, en 2004. La mise en œuvre de la législation sur le ciel unique européen a fait l'objet d'un suivi régulier. Les points suivants méritent d'être signalés:

        • tous les États membres ont maintenant mis en place leur autorité de surveillance nationale (ASN);
        • la grande majorité des prestataires de services de navigation aérienne ont été certifiés et dûment désignés;
        • un système de tarification transparent a vu le jour;
        • la surveillance de la gestion de l'espace aérien et des courants de trafic aérien s'exerce au niveau national ;
        • le comité du ciel unique et l'organe consultatif de branche jouent pleinement leur rôle au niveau de l'UE.

        Cependant, des efforts supplémentaires son nécessaires pour mettre en œuvre pleinement et dans les délais la législation sur le ciel unique européen. Par exemple, Eurocontrol a émis 60 recommandations concernant les mesures concrètes que les États membres devraient prendre pour améliorer leur niveau de conformité ou les contrôles du niveau de conformité des prestataires de services de navigation aérienne. Plus particulièrement :

        • le manque de ressources des ASN pour exercer une surveillance efficace dans tous les domaines, notamment la sécurité, l'interopérabilité et les performances, est une source de préoccupation majeure qu'il convient de traiter rapidement au niveau politique national ; les solutions pour remédier à ces problèmes sont bien connues (coopération, délégation et/ou externalisation notamment);
        • les mesures prises au niveau des États membres et des ASN pour garantir une surveillance adéquate de la prestation transfrontalière de services de navigation aérienne sont insuffisantes ; les États membres doivent veiller à ce que la base juridique de la prestation transfrontalière des services de navigation aérienne soit correctement établie sur leur territoire ;
        • la mise en œuvre du règlement (CE) nº 552/2004 sur l'interopérabilité est insuffisante : sept ans après l'adoption du règlement de base, environ un tiers des ASN n'ont pas vérifié de manière appropriée la capacité des prestataires de services de navigation aérienne à mener des activités d'évaluation de la conformité ;
        • enfin, bien que les États membres aient progressé dans l'application du concept de gestion souple de l'espace aérien, ils doivent redoubler d'efforts pour améliorer son efficacité, notamment en ce qui concerne le suivi des performances.

        Les progrès accomplis dans certains domaines sont insuffisants, ce qui laisse supposer que plusieurs échéances de mise en œuvre ne pourront pas être respectées. Les États membres doivent donc prendre des mesures correctrices. En octobre 2011, la Commission a adressé à chaque État membre un courrier en ce sens dans lequel elle expose les problèmes propres à chacun et insiste sur la nécessité de se conformer pleinement à la législation européenne, condition indispensable pour réussir la mise en œuvre du deuxième paquet. Lorsque la non-conformité sera avérée et qu'aucune mesure correctrice n'aura été prise en temps voulu, la Commission examinera toutes les options à sa disposition, notamment l'ouverture de procédures d'infraction.

        2) État d’avancement de la mise en œuvre du deuxième paquet : l'architecture de base du «ciel unique européen II» (programme réglementaire et aspects organisationnels) a été mise en place conformément au calendrier initial. Tous les règlements et leurs principales mesures d'exécution en lien direct avec le ciel unique européen II ont été adoptés. De même, l'essentiel du nouveau cadre institutionnel est en place.

        La Commission estime que le ciel unique européen ne sera un succès que si ses différentes composantes sont mises en œuvre dans les délais. 2012 est donc une année charnière pour la mise en œuvre du ciel unique européen. Priorité devrait être donnée aux actions qui contribuent le plus à l'amélioration des performances, en particulier :

        • le «système de performance» (qui débutera au début de 2012),
        • les blocs d'espace aérien fonctionnels (qui seront opérationnels d'ici à fin 2012),
        • les fonctions de réseau (déjà en place) et
        • le déploiement du programme SESAR (à partir de 2014).

        Si le niveau des progrès accomplis à ce jour dans la mise en œuvre du premier paquet législatif se situe en deçà des attentes initiales, la mise en œuvre simultanée de mesures clés du deuxième paquet, qui débutera en 2012, devrait produire rapidement des effets bénéfiques importants. Les États membres sont invités à confirmer leurs engagements et à prendre des mesures à tous les niveaux afin de faire de ce processus un succès.

        En particulier, l'Union doit mettre en place un système européen intégré de gestion du trafic aérien, un véritable réseau doté d'une structure de gouvernance unique et une capacité renforcée de surveillance et de réglementation.

        Des mesures supplémentaires peuvent et doivent être développées, telles que l'extension du système de performance aux aéroports selon une véritable approche «porte à porte» et la gestion des investissements pour que le déploiement du programme SESAR contribue aux performances du ciel unique européen en tant que réseau. Une analyse d'impact sera menée le cas échéant.  

      celexid
      CELEX:52011DC0731:EN
      type
      Publication du document de base non-législatif
      title
      COM(2011)0731
    body
    unknown
    type
    Publication du document de base non-législatif
    deletedactivities/1
    date
    2011-11-14
    docs
    • url
      http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=0731
      text
      • PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.

        BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.

        But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.

        CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.

        (1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:

        ·        all Member States have now established a National Supervisory Authority (NSA);

        ·        the vast majority of the ANSPs have been certified and duly designated;

        ·        a transparent charging system has been implemented;

        ·        oversight of the airspace management and air traffic flow management takes place at national level; and

        ·        the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.

        Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:

        ·        the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;

        ·        insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;

        ·        Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities – which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;

        ·        although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.

        The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.

        (2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:

        • in particular the performance scheme (starting early in 2012);
        • the FABs (to be operational by end 2012),
        • the network functions (already in place) and
        • the deployment of the SESAR programme (to start in 2014).

        2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.

        If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.

      celexid
      CELEX:52011DC0731:EN
      type
      Non-legislative basic document published
      title
      COM(2011)0731
    type
    Non-legislative basic document
    body
    EC
    commission
    • DG
      Commissioner
      KALLAS Siim
    addedactivities/3
    date
    2012-01-19
    body
    unknown
    type
    Annonce en plénière de la saisine de la commission, 1ère lecture/lecture unique
    deletedactivities/3
    date
    2012-01-19
    body
    EP
    type
    Committee referral announced in Parliament, 1st reading/single reading
    committees
    addedactivities/4
    date
    2012-09-11
    body
    unknown
    type
    Date indicative de la séance plénière, 1ère lecture/lecture unique
    deletedactivities/4
    date
    2012-09-11
    body
    EP
    type
    Indicative plenary sitting date, 1st reading/single reading
    addedactivities/5
    body
    EP
    date
    2012-09-11
    type
    EP 1R Plenary
    addedactivities/6
    body
    EC
    date
    2012-09-11
    type
    Prev DG PRES
    commission
      deletedcommittees/0
      body
      EP
      responsible
      False
      committee_full
      Employment and Social Affairs
      committee
      EMPL
      deletedcommittees/1
      body
      EP
      responsible
      False
      committee_full
      Internal Market and Consumer Protection
      committee
      IMCO
      deletedcommittees/2
      body
      EP
      responsible
      False
      committee_full
      Legal Affairs
      committee
      JURI
      deletedcommittees/3
      body
      EP
      shadows
      responsible
      True
      committee
      TRAN
      date
      2012-01-12
      committee_full
      Transport and Tourism
      rapporteur
      • group
        ECR
        name
        FOSTER Jacqueline
      deletedother/0
      body
      EC
      dg
      commissioner
      KALLAS Siim
      addedprocedure/Base juridiqueRèglement du Parlement européen EP 048 addedprocedure/Dossier de la commission parlementaireTRAN/7/08576 addedprocedure/Etape de la procédureEn attente de la 1ère lecture du Parlement / lecture unique / 1ère phase du budget addedprocedure/Référence de procédure2012/2005(INI) addedprocedure/Sous-type de procédureRapport d’initiative addedprocedure/Type de procédureINI - Procédure d'initiative deletedprocedure/dossier_of_the_committeeTRAN/7/08576 deletedprocedure/legal_basis
      • Rules of Procedure of the European Parliament EP 048
      changeprocedure/stage_reachedEn attente de la 1ère lecture du Parlement / lecture unique / 1ère phase du budgetAwaiting Parliament 1st reading / single reading / budget 1st stage deletedprocedure/subject
      • 3.20.01 Air transport and air freight
      • 8.50.01 Implementation of Community law
      deletedprocedure/subtypeInitiative addedprocedure/sujet
      • 3.20.01 Transport aérien de personnes et frêt
      • 8.50.01 Application du droit communautaire
      changeprocedure/titleMise en œuvre de la législation sur le ciel unique européenImplementation of the Single European Sky legislation changeprocedure/typeINI - Procédure d'initiativeINI - Own-initiative procedure ]]>
      2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewolddeletedactivities/0
      date
      2011-11-14
      docs
      • url
        http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=0731
        text
        • PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.

          BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.

          But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.

          CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.

          (1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:

          ·        all Member States have now established a National Supervisory Authority (NSA);

          ·        the vast majority of the ANSPs have been certified and duly designated;

          ·        a transparent charging system has been implemented;

          ·        oversight of the airspace management and air traffic flow management takes place at national level; and

          ·        the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.

          Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:

          ·        the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;

          ·        insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;

          ·        Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities – which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;

          ·        although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.

          The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.

          (2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:

          • in particular the performance scheme (starting early in 2012);
          • the FABs (to be operational by end 2012),
          • the network functions (already in place) and
          • the deployment of the SESAR programme (to start in 2014).

          2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.

          If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.

        celexid
        CELEX:52011DC0731:EN
        type
        Non-legislative basic document published
        title
        COM(2011)0731
      body
      type
      Non-legislative basic document published
      addedactivities/1
      date
      2011-11-14
      docs
      • url
        http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=0731
        text
        • PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.

          BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.

          But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.

          CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.

          (1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:

          ·        all Member States have now established a National Supervisory Authority (NSA);

          ·        the vast majority of the ANSPs have been certified and duly designated;

          ·        a transparent charging system has been implemented;

          ·        oversight of the airspace management and air traffic flow management takes place at national level; and

          ·        the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.

          Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:

          ·        the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;

          ·        insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;

          ·        Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities – which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;

          ·        although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.

          The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.

          (2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:

          • in particular the performance scheme (starting early in 2012);
          • the FABs (to be operational by end 2012),
          • the network functions (already in place) and
          • the deployment of the SESAR programme (to start in 2014).

          2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.

          If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.

        celexid
        CELEX:52011DC0731:EN
        type
        Non-legislative basic document published
        title
        COM(2011)0731
      type
      Non-legislative basic document
      body
      EC
      commission
      • DG
        Commissioner
        KALLAS Siim
      deletedactivities/2
      date
      2011-11-14
      docs
      • url
        http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=0731
        text
        • PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.

          BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.

          But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.

          CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.

          (1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:

          ·        all Member States have now established a National Supervisory Authority (NSA);

          ·        the vast majority of the ANSPs have been certified and duly designated;

          ·        a transparent charging system has been implemented;

          ·        oversight of the airspace management and air traffic flow management takes place at national level; and

          ·        the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.

          Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:

          ·        the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;

          ·        insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;

          ·        Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities – which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;

          ·        although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.

          The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.

          (2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:

          • in particular the performance scheme (starting early in 2012);
          • the FABs (to be operational by end 2012),
          • the network functions (already in place) and
          • the deployment of the SESAR programme (to start in 2014).

          2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.

          If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.

        celexid
        CELEX:52011DC0731:EN
        type
        Non-legislative basic document
        title
        COM(2011)0731
      body
      EC
      type
      Non-legislative basic document
      commission
      • DG
        Mobility and Transport
        Commissioner
        KALLAS Siim
      addedother/0
      body
      EC
      dg
      commissioner
      KALLAS Siim
      deletedother/0
      body
      EC
      dg
      Mobility and Transport
      commissioner
      KALLAS Siim
      ]]>
      2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewolddeletedactivities/6
      body
      EC
      date
      2012-09-11
      type
      Prev DG PRES
      commission
      • DG
        Mobility and Transport
        Commissioner
        KALLAS Siim
      ]]>
      2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldaddedactivities/4
      date
      2012-01-19
      body
      EP
      type
      Committee referral announced in Parliament, 1st reading/single reading
      committees
      deletedactivities/4
      date
      2012-01-19
      body
      EP
      type
      Committee referral announced in Parliament, 1st reading/single reading
      committees
      addedcommittees/3
      body
      EP
      shadows
      responsible
      True
      committee
      TRAN
      date
      2012-01-12
      committee_full
      Transport and Tourism
      rapporteur
      • group
        ECR
        name
        FOSTER Jacqueline
      deletedcommittees/3
      body
      EP
      shadows
      responsible
      True
      committee
      TRAN
      date
      2012-01-12
      committee_full
      Transport and Tourism
      rapporteur
      • group
        ECR
        name
        FOSTER Jacqueline
      ]]>
      2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldaddedactivities/4
      date
      2012-01-19
      body
      EP
      type
      Committee referral announced in Parliament, 1st reading/single reading
      committees
      deletedactivities/4
      date
      2012-01-19
      body
      EP
      type
      Committee referral announced in Parliament, 1st reading/single reading
      committees
      addedcommittees/3
      body
      EP
      shadows
      responsible
      True
      committee
      TRAN
      date
      2012-01-12
      committee_full
      Transport and Tourism
      rapporteur
      • group
        ECR
        name
        FOSTER Jacqueline
      deletedcommittees/3
      body
      EP
      shadows
      responsible
      True
      committee
      TRAN
      date
      2012-01-12
      committee_full
      Transport and Tourism
      rapporteur
      • group
        ECR
        name
        FOSTER Jacqueline
      ]]>
      2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldchangeactivities/0/docs/0/urlhttp://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=0731http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexapi!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=0731&model=guicheti changeactivities/2/docs/0/urlhttp://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=0731http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexapi!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=0731&model=guicheti addedactivities/4
      date
      2012-01-19
      body
      EP
      type
      Committee referral announced in Parliament, 1st reading/single reading
      committees
      deletedactivities/4
      date
      2012-01-19
      body
      EP
      type
      Committee referral announced in Parliament, 1st reading/single reading
      committees
      changecommittees/0/committee_fullEmployment and Social Affairs Employment and Social Affairs changecommittees/1/committee_fullInternal Market and Consumer Protection Internal Market and Consumer Protection changecommittees/2/committee_fullLegal Affairs Legal Affairs addedcommittees/3
      body
      EP
      shadows
      responsible
      True
      committee
      TRAN
      date
      2012-01-12
      committee_full
      Transport and Tourism
      rapporteur
      • group
        ECR
        name
        FOSTER Jacqueline
      deletedcommittees/3
      body
      EP
      shadows
      responsible
      True
      committee
      TRAN
      date
      2012-01-12
      committee_full
      Transport and Tourism
      rapporteur
      • group
        ECR
        name
        FOSTER Jacqueline
      ]]>
      2012-10-26T03:57:56 /dossier/2012/2005(INI)/2012-10-26T03:57:56 2012-10-26T03:57:56 typechange innewoldaddedactivities
      • date
        2011-11-14
        docs
        • url
          http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexapi!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=0731&model=guicheti
          text
          • PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.

            BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.

            But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.

            CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.

            (1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:

            ·        all Member States have now established a National Supervisory Authority (NSA);

            ·        the vast majority of the ANSPs have been certified and duly designated;

            ·        a transparent charging system has been implemented;

            ·        oversight of the airspace management and air traffic flow management takes place at national level; and

            ·        the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.

            Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:

            ·        the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;

            ·        insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;

            ·        Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities – which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;

            ·        although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.

            The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.

            (2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:

            • in particular the performance scheme (starting early in 2012);
            • the FABs (to be operational by end 2012),
            • the network functions (already in place) and
            • the deployment of the SESAR programme (to start in 2014).

            2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.

            If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.

          celexid
          CELEX:52011DC0731:EN
          type
          Non-legislative basic document published
          title
          COM(2011)0731
        body
        type
        Non-legislative basic document published
      • body
        EP
        date
        2011-11-14
        type
        Date
      • date
        2011-11-14
        docs
        • url
          http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexapi!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2011&nu_doc=0731&model=guicheti
          text
          • PURPOSE: presentation of a report from the Commission on implementation of the Single Sky legislation: time to deliver.

            BACKGROUND: following the launch of the Single European Sky (SES) initiative in 2000, Regulation (EC) No 549/2004 brought Air Traffic Management (ATM) under EU competence with the aim of reducing the fragmentation of the European airspace and increasing its capacity. There is now an evolving institutional framework, safety and interoperability standards and rules on airspace and air traffic flow management as well as improved cost transparency.

            But while the first legislative framework was necessary, it was not sufficient, and accordingly, a second package of legislation (SES II) was adopted in November 2009 with the objective of accelerating the establishment of a truly single SES from 2012 onwards. It is based on five pillars: performance, safety, technology, airports and the human factor. The second package has received strong and vocal support not only from the airlines and airports but also even from the air navigation service providers (ANSPs). The support of the whole ATM community was reaffirmed at the Council of Ministers of 4 May 2010 and this strong political support confirms the urgency of the need for reform of the ATM sector and in particular the high level of priority to be given to the full and timely implementation and delivery of SES.

            CONTENT: this report provides an overview of the state of play of the application of the SES legislation and of key actions taken or still to be taken since the approval of the second package in November 2009.

            (1) Implementation of the First Package: considering the volume of implementing measures, it should be stressed that Member States and the stakeholders have done significant work. In particular:

            ·        all Member States have now established a National Supervisory Authority (NSA);

            ·        the vast majority of the ANSPs have been certified and duly designated;

            ·        a transparent charging system has been implemented;

            ·        oversight of the airspace management and air traffic flow management takes place at national level; and

            ·        the Single Sky Committee and the Industry Consultation Body play full and important roles at EU level.

            Nevertheless more is required to achieve full and timely compliance with SES legislation. For example, 60 recommendations were given by Eurocontrol relating to concrete actions that Member States should take either to improve their level of compliance or their checks on the level of compliance by ANSPs. In particular:

            ·        the lack of resources for NSAs is a major issue of concern that must be addressed at national political level swiftly. The proper functioning of the SES can only be assured if the NSAs have the right resources for effective oversight in all areas including safety, interoperability and performance (a new area of competence where NSAs act as national regulator). Possible solutions to these problems are well known and include cooperation, delegation and/or outsourcing;

            ·        insufficient steps have been taken at Member State and NSA level to ensure proper supervision of cross-border air navigation service provision. The framework for the provision and supervision of cross-border services is not yet properly established in a number of Member States. Numerous cross-border arrangements seem to be known only at operational level but not yet formalised at institutional level. Member States must ensure that the legal basis for the cross-border provision of ANS in their sovereign territory is correctly established and enforced, and;

            ·        Regulation (EC) No 552/2004 (the Interoperability Regulation) has been poorly observed. Seven years after the adoption of the basic regulation, approximately a third of the NSAs have not properly verified the capability of the ANSPs to conduct conformity assessment activities – which are the corner stone of the implementation of interoperable ATM systems. Similarly, around a third of the NSAs are not exercising the required oversight to ensure the compliance of the ANSPs with the implementing rules and are not sufficiently active in verifying the timelines of the ANSPs' implementation plans against the required deadlines;

            ·        although progress has been made by Member States in the implementation of Flexible Use of Airspace, more needs to be done to improve its effectiveness, especially in relation to its performance monitoring.

            The Commission has insisted on full compliance with EU law keeping in mind that the implementation of the SES first package is required for the successful implementation of the SES second package. Where non-compliance is confirmed and not rectified in due time, the Commission will consider all options at its disposal, including the opening of infringement procedures.

            (2) Implementation of the Second Package: the basic SES II architecture (both the rule-making programme and organisational aspects) has been set up according to the initial time schedule. The regulations and subsequent main implementing measures directly related to SES II have all been adopted. The time for implementation has come. The successful delivery of the SES relies on the timely implementation of its different components. Priority should be given to actions that will make the biggest contribution to performance:

            • in particular the performance scheme (starting early in 2012);
            • the FABs (to be operational by end 2012),
            • the network functions (already in place) and
            • the deployment of the SESAR programme (to start in 2014).

            2012 is a pivotal year for implementation of the SES. A table providing an overview of the state of play of key priorities in the second package of SES is attached.

            If the level of progress achieved so far in the implementation of the first package falls short of initial expectations, the simultaneous implementation of key measures of the second package will start in 2012 and should deliver significant benefits swiftly. Member States are invited to confirm their commitments and to take action across the board to make this process a success. In particular, the Union needs to establish an integrated European air traffic management system, a true network with a single governance structure and a stronger regulatory and oversight capability. Additional measures may well need to be developed, such as the extension of the performance scheme to airports in accordance with a true gate-to-gate approach and the management of investments to ensure the contribution of SESAR deployment to the performance of the SES as a network. Impact assessment will be carried out where appropriate.

          celexid
          CELEX:52011DC0731:EN
          type
          Non-legislative basic document
          title
          COM(2011)0731
        body
        EC
        commission
        • DG
          Mobility and Transport
          Commissioner
          KALLAS Siim
        type
        Non-legislative basic document
      • body
        EP
        date
        2012-01-12
        type
        EP officialisation
      • date
        2012-01-19
        body
        EP
        type
        Committee referral announced in Parliament, 1st reading/single reading
        committees
      • date
        2012-09-11
        body
        EP
        type
        Indicative plenary sitting date, 1st reading/single reading
      • body
        EC
        date
        2012-09-11
        type
        Prev DG PRES
        commission
        • DG
          Mobility and Transport
          Commissioner
          KALLAS Siim
      addedcommittees
      • body
        EP
        responsible
        False
        committee_full
        Employment and Social Affairs
        committee
        EMPL
      • body
        EP
        responsible
        False
        committee_full
        Internal Market and Consumer Protection
        committee
        IMCO
      • body
        EP
        responsible
        False
        committee_full
        Legal Affairs
        committee
        JURI
      • body
        EP
        shadows
        responsible
        True
        committee
        TRAN
        date
        2012-01-12
        committee_full
        Transport and Tourism
        rapporteur
        • group
          ECR
          name
          FOSTER Jacqueline
      addedlinks addedother
      • body
        EC
        dg
        Mobility and Transport
        commissioner
        KALLAS Siim
      addedprocedure
      dossier_of_the_committee
      TRAN/7/08576
      reference
      2012/2005(INI)
      title
      Implementation of the Single European Sky legislation
      legal_basis
      • Rules of Procedure of the European Parliament EP 048
      stage_reached
      Awaiting Parliament 1st reading / single reading / budget 1st stage
      subtype
      Initiative
      type
      INI - Own-initiative procedure
      subject
      ]]>