2010/2001(BUD)

2011 budget: all sections, first version

Procedure lapsed or withdrawn

2010/2001(BUD) 2011 budget: all sections, first version
RoleCommitteeRapporteurShadows
Opinion AFCO SAUDARGAS Algirdas (EPP)
Opinion AFET SALAFRANCA SÁNCHEZ-NEYRA José Ignacio (EPP)
Opinion AGRI MCGUINNESS Mairead (EPP)
Lead BUDG
Lead BUDG JĘDRZEJEWSKA Sidonia Elżbieta (EPP), TRÜPEL Helga (Verts/ALE)
Opinion CONT LIBERADZKI Bogusław (S&D)
Opinion CULT LØKKEGAARD Morten (ALDE)
Opinion DEVE BERMAN Thijs (S&D)
Opinion ECON SCHWAB Andreas (EPP)
Opinion EMPL BERÈS Pervenche (S&D)
Opinion ENVI
Opinion FEMM
Opinion IMCO
Opinion INTA ŠŤASTNÝ Peter (EPP)
Opinion ITRE HERCZOG Edit (S&D)
Opinion JURI
Opinion LIBE LÓPEZ AGUILAR Juan Fernando (S&D)
Opinion PECH
Opinion PETI
Opinion REGI SURJÁN László (EPP)
Opinion TRAN
Lead committee dossier: BUDG/7/01917; BUDE/7/04374
Subjects
Links

Activites

  • 2010/11/15 Agreement not reached in budgetary conciliation
  • 2010/10/25 Start of budgetary conciliation (Parliament and Council)
  • #3040
  • 2010/10/25 Council Meeting
  • 2010/10/20 Budgetary text adopted by Parliament
    • T7-0372/2010 summary
    • Results of vote in Parliament
  • 2010/10/20 Document attached to the procedure
    • COM(2010)0601 summary
    • DG Budget, LEWANDOWSKI Janusz
  • 2010/10/19 Debate in Parliament
  • 2010/10/15 Amending/supplementary letter on draft budget
    • 15000/2010 summary
  • 2010/10/11 Budgetary report tabled for plenary, 1st reading
  • 2010/10/11 Budgetary report tabled for plenary, 1st reading
  • 2010/10/11 Document attached to the procedure
    • SEC(2010)1199 summary
    • DG Budget, LEWANDOWSKI Janusz
  • 2010/10/07 Vote in committee, 1st reading/single reading
  • 2010/10/01 Committee draft report
  • 2010/09/20 Committee referral announced in Parliament, 1st reading/single reading
  • 2010/09/15 Document attached to the procedure
    • SEC(2010)1064 summary
    • DG Budget, LEWANDOWSKI Janusz
  • 2010/08/12 Council position on draft budget published
    • 12699/2010 summary
  • 2010/08/12 Document attached to the procedure
    • 12700/2010 summary
    • 12699/2010 summary
  • #3015
  • 2010/05/18 Council Meeting
  • 2010/04/27 Commission draft budget published
    • COM(2010)0300 summary
  • 2010/04/27 Commission draft budget
    • COM(2010)0300 summary
    • DG Budget, LEWANDOWSKI Janusz

Documents

Votes

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 17/1

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 588 73 13 13 25 2 243 172 47 0
Against 68 3 32 12 0 17 3 0 1 0
Abstain 13 0 0 0 6 4 0 0 3 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 17/2

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 233 6 33 2 22 3 4 162 1 0
Against 416 71 11 21 3 18 244 0 48 0
Abstain 6 0 0 0 4 2 0 0 0 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 12

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 92 12 35 22 2 14 2 1 4 0
Against 564 61 11 4 21 5 246 172 44 0
Abstain 8 1 0 0 3 4 0 0 0 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 19

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 259 4 0 3 30 3 1 167 51 0
Against 401 75 45 21 0 14 245 1 0 0
Abstain 9 1 1 1 0 6 0 0 0 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 20/1

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 333 71 3 2 24 7 2 173 51 0
Against 330 8 44 22 0 10 246 0 0 0
Abstain 13 1 0 0 7 5 0 0 0 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 20/2

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 553 77 15 4 0 3 237 169 48 0
Against 74 1 32 21 0 13 5 2 0 0
Abstain 35 0 0 1 28 6 0 0 0 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 13

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 167 65 42 22 2 19 7 7 3 0
Against 488 14 3 3 23 2 237 161 45 0
Abstain 6 0 0 0 4 2 0 0 0 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 21/1

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 560 81 1 1 10 3 241 173 50 0
Against 89 0 32 25 8 16 7 1 0 0
Abstain 28 0 12 0 11 4 0 0 1 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 21/2

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 561 79 1 2 24 5 234 167 49 0
Against 71 0 30 23 1 12 5 0 0 0
Abstain 18 0 10 0 2 6 0 0 0 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 21/3

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 572 81 1 0 26 2 239 172 51 0
Against 79 0 32 25 1 16 5 0 0 0
Abstain 21 0 13 0 3 5 0 0 0 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 27/1

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 508 14 11 2 30 11 243 152 45 0
Against 139 62 35 11 0 4 6 21 0 0
Abstain 21 2 0 11 1 7 0 0 0 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 27/2

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 70 13 0 0 28 9 10 6 4 0
Against 520 63 47 12 0 3 233 162 0 0
Abstain 69 2 0 11 2 10 0 0 44 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 8 S

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 364 27 23 9 6 4 226 68 1 0
Against 230 47 2 4 10 13 22 82 50 0
Abstain 71 7 22 5 11 6 2 18 0 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 14/1

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 117 15 34 22 3 14 26 3 0 0
Against 531 64 0 1 28 6 222 163 47 0
Abstain 25 1 12 1 0 3 0 6 2 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 14/2

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 575 20 41 23 25 21 234 164 47 0
Against 63 56 1 0 1 0 2 3 0 0
Abstain 9 3 0 0 4 1 0 0 1 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 14/3

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 603 27 47 24 28 22 242 165 48 0
Against 54 47 0 1 3 0 1 2 0 0
Abstain 3 2 0 0 0 1 0 0 0 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 14/4

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 367 29 45 21 26 22 11 164 49 0
Against 290 49 0 2 3 0 234 2 0 0
Abstain 4 1 0 1 1 1 0 0 0 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 15

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 117 12 45 23 9 12 6 8 2 0
Against 542 65 0 1 13 6 243 165 49 0
Abstain 15 2 0 1 9 3 0 0 0 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 16

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 199 19 43 23 27 14 6 17 50 0
Against 444 49 0 3 2 5 238 147 0 0
Abstain 7 2 0 0 1 1 1 2 0 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Am 6

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 192 75 44 25 4 19 5 17 3 0
Against 447 2 0 1 5 0 240 153 46 0
Abstain 26 0 1 0 21 3 0 1 0 0

Rapport Jędrzejewska/Trüpel A7-0284/2010 - Résolution

2010/10/20
Position Total ALDE ECR EFD GUE/NGL NI PPE S&D Verts/ALE correctional
For 546 67 12 2 0 5 249 161 50 0
Against 88 9 34 14 5 15 0 10 1 0
Abstain 39 0 0 9 26 3 0 1 0 0
AmendmentsDossier
149 2010/2001(BUD) 2011 budget: all sections, first version
2010/01/09 AFET 7 amendments...
source: PE-445.959
2010/06/29 EMPL 14 amendments...
source: PE-443.099
2010/07/19 ENVI 6 amendments...
source: PE-445.842
2010/07/20 ECON 34 amendments...
source: PE-445.849
2010/07/26 CULT 36 amendments...
source: PE-445.812
2010/07/27 REGI 4 amendments...
source: PE-445.866
2010/07/28 AFCO 6 amendments...
source: PE-445.890
2010/08/09 AGRI 3 amendments...
source: PE-448.701
2010/08/16 IMCO 4 amendments...
source: PE-445.907
2010/08/20 INTA 14 amendments...
source: PE-445.882
2010/08/27 LIBE 15 amendments...
source: PE-445.965
2010/09/13 CONT 6 amendments...
source: PE-448.696

History

(these mark the time of scraping, not the official date of the change)

2012-02-09
activities added
  • date
    2010-04-27
    docs
    • url
      http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2010&nu_doc=0300
      text
      • PURPOSE: to present the draft budget of the Commission for the financial year 2011.

        CONTENT: the Commission adopted the first draft budget of the "Lisbon era" - the draft budget for the financial year 2011. It is also the fifth budget under the Financial Perspectives 2007-2013 whose main objective will be to boost economic recovery, invest in Europe's youth and in tomorrow's infrastructures.

        Budget details: out of a total of €142.6 billion, some €64.4 billion are geared towards economic recovery actions (+3.4% on 2010). Furthermore, the funds backing the flagship initiatives of the EU 2020 strategy (for growth) represent some €57.9 billion (some 40% of the Budget).

        For payment appropriations, the total amounts to €130 136,0 million, corresponding to 1.04 % of GNI. This is an increase of €7 179.1 million compared to payment appropriations in the 2010 budget, and leaves a margin of €4 429,0 million under the ceiling.

        The main budgetary priorities for 2011: the main objective in 2011 will fully support the European economic recovery, strengthening and improving growth prospects. The EU budget has two main priorities:

        1. Supporting the EU economy post-crisis: competitiveness for growth and employment, with €13.4 billion, and Cohesion for growth and employment, allocated with €51.0 billion, support the EU economy by reinforcing the conditions for future growth. Investments in research, development, and innovation, infrastructure and human capital are at the heart of economic modernisation and are reinforced through relevant key programmes. These actions are in line with the priority areas identified by the Europe 2020 strategy. In these key policy areas, the 2011 Draft Budget foresees significant increases in payment appropriations, delivering real implementation on the ground. In particular, increased payment levels for activities under Competitiveness for Growth and Employment and for Cohesion for growth and employment prove that these policies are implemented vigorously to accelerate the recovery process. Accompanied by actions in favour of education, training and lifelong learning, the European Microfinance facility and the support of programmes addressed to youth will contribute in consolidating our exit from the crisis and assist the younger generations. Reinforced payment levels for growth and employment are combined in the 2011 Draft Budget with stable funding levels for market related expenditure and direct aids under the Common Agricultural  Policy (CAP) as well as for rural development.
        2. Adapting to new requirements in the area of financial services and supervision: three new EU Authorities will assist national authorities in applying EU rules and link national supervisors into a strong EU network. The financial supervision authorities will be part of the European System of Financial Supervisors (ESFS). In addition, the financing of Global Monitoring for Environment and Security (GMES) begins in 2011 with the allocation of €10 million. This initiative provides better environmental monitoring and management, and increased security. The substantial increase foreseen for the area of Freedom, Security and Justice (heading 3a, + 12.8% in commitment appropriations and + 15.4% in payment appropriations), and in particular for Solidarity and management of migration flows, reflects the importance attached to the implementation of the recently adopted 'Stockholm programme' for which an Action Plan has been proposed by the Commission. Other new initiatives are preparatory actions on 'Mainstreaming climate action and adaptation' (heading 2), the 'European Year of Volunteering' (heading 3b on citizenship) and, under heading 4, the new 'European Voluntary Humanitarian Aid Corps'. Finally, the sustained level of commitment appropriations for the EU as a global player (heading 4) will allow the Union, reinforced by the new European External Action Service, to continue to play its role on the world stage, including in the area of climate action (additional commitment appropriations amounting to EUR 65 million) further to the Copenhagen Accord reached in December 2009.

        MAIN CHARACTERISTICS BY BUDGET HEADING: the presentation below is structured according to the budget categories of the financial framework 2007-2013:

        Heading 1: Sustainable Growth: this section includes expenditure related to competitiveness, employment and cohesion:

        • 1a Competitiveness for growth and employment: this sub-section brings together many of the flagship initiatives set out in the Europe 2020 strategy including 'innovation Union', 'youth on the move', 'resource efficiency Europe', 'new skills and jobs' and 'industrial policy for the globalisation era'. The main programmes of this heading are the 7th Framework Programme for research and technological development (FP7), the Lifelong Learning Programme, the Competitiveness and Innovation Programme (CIP), the Trans-European Networks (TENs), GALILEO/EGNOS and Marco Polo II, and the PROGRESS Programme. Other actions contributing to the goals of the priority themes of the Europe 2020 strategy concern the internal market, statistics, financial services and supervision, the fight against fraud, taxation and the customs union. Commitment appropriations for heading 1a are set at €13.436,9 million, which is a decrease of 9.6% compared to the 2010 budget. This leaves a margin of €50.1 million. Payment appropriations increase by 6.8 % to €12.109,7 million. The apparent reduction in commitment appropriations for this heading must be seen in the context of the inclusion in the 2010 budget of the second tranche of additional appropriations for the funding of energy projects to aid economic recovery, as mentioned above. Once this element is excluded, commitment and payment appropriations increase by 4.4% and 7.0 % respectively.
        • 1b Cohesion for growth and employment: the sub-section covers mainly the Structural Funds (ERDF, ESF and Cohesion Fund). The commitments included up 3.2% to €50.970,1 million, which leaves a margin of €16.9 million. The payment appropriations rise 16.9% to €42.540,8 million. The substantial increase in the level of payments reflects the momentum of the Cohesion Policy 2007-2013 on the ground, and hence its contribution to economic recovery in Europe. Because the management systems and controls are in place and that programmes are on track, further significant increases in annual payment needs are expected towards the end of the current programming period. Overall and by their nature, the Cohesion policy objectives contribute to the Europe 2020 strategy in terms of promoting smart greener and competitive growth of regional economies based on knowledge, innovation and resource efficiency.

        Heading 2: Preservation and management of natural resources: for 2011, the Commission proposes commitment appropriations amounting to €59.486.2 million for heading 2. This level of funding, stable compared to 2010, leaves a margin of €851.8 million under the ceiling. The margin increase compared to 2010 is due primarily to a decrease in interventions in agricultural markets (expected decline of approximately €900 million). The continuation of the progressive introduction of direct aid to the EU 12 countries as well as improving the situation on agricultural markets are the main factors behind this development. Payment appropriations amount to €58.136.7 million. The amount for market related expenditure and direct aid amounted to €43.747,4 million in commitment appropriations and €43.656,8 million in payments.

        Heading 3: Citizenship, freedom, security and justice: this section is divided into two sub-sections:

        • 3.a Freedom, Security and Justice: this sub-heading is devoted to activities in the area of freedom, security and justice. The year 2010 will correspond to an implementation consistent and reinforced by specific actions, grouped into three general programmess (Solidarity and Management of Migration Flows, Fundamental Rights and Justice and Security and Safeguarding Liberties). The PB provides a substantial increase in the sub-heading in the order of 12.8% to €1.135.3 million, so there remains a margin of €70.7 million. Payment appropriations are also subject to a significant increase of 15.4% to €852.4 million. It should be noted that the funds originally earmarked for the Information System (VIS) and the Schengen Information System (SIS) have been lower than originally forecast, totalling €60 million. Part of this allocation will be used to finance (up to €10.6 million) the new agency for the operational management of information systems to large scale.
        • 3.b Citizenship: this sub-heading contributes to numerous Europe 2020 strategy flagship initiatives including 'youth on the move', 'an agenda for new skills and jobs', 'European platform against poverty' and 'innovative Union'. In particular this heading covers issues which are of key concern to the citizens of Europe, including health, consumer protection, and civil protection. The crucial task of reaching out to the citizens and communicating Europe also fall within this heading, through the funding of cultural programmes and the policy area Communication. The commitment appropriations amounted to €667.8 million, leaving a margin of €15.2 million. Payment appropriations for this category fell by 3.1%, to €639 million. The annual limit for this section remains generally stable in the current financial framework. The Commission has deliberately kept a margin to account for unforeseen expenses and possible policy adjustments during budget procedure and, consequently, the level of commitments remain unchanged from 2010.

        Heading 4: EU as a global player: Heading 4 shows an increase of 5.6% in commitment appropriations to €8 613.5 million, leaving a margin of €70.3 million under the ceiling. Payment appropriations decreased by 2.4% to €7.601,8 million. In 2011, the implementation of almost all programmes should continue at cruising speed. Based on the financial framework 2007-2013, the PB 2011 continues to meet the overall profile of the multiannual financial envelope allocated to the respective instruments. The major action planned for 2011 is the further intensification of bilateral, regional and thematic EU programmes. Additional efforts to address the causes and consequences of climate change in third countries will be increasingly financed from funds committed for annual action plans of the geographic instruments. The following should also be noted: (a) the strengthening EU commitments at the forthcoming UN conference on Millennium Development Goals (€65 million); (b) strengthening the support provided by EU to efforts in developing countries to address climate change (€65 million); (c) a new framework to support the economic and social development of the Turkish Cypriot community (€25 million).

        Heading 5: Administration: commitments and payments increased by 4.4%, the first amounting to EUR 8255.4 million and the second to €8.256 million. Thus there remains a margin of €160.6 million. The Commission has made special efforts to reduce its administrative expenditure, which grew 2.9%, resulting partly from an increase in wages which were higher than expected in 2009. This moderate increase in administrative expenditure results also in the fact that the Commission is not requesting any additional posts. The Commission expects to achieve its priority objectives, including those arising from the entry into force of the Treaty of Lisbon by a major redevelopment effort. Section 5 also covers the administrative expenditure of other institutions based on their respective estimates. These estimates take into account the additional requirements associated with entry into force of the Lisbon Treaty, particularly as regards the Parliament, the European Council and the Council, the Economic and Social Committee and the Committee of Regions. The Commission's draft budget was established without prejudice to the creation of the European External Action Service (EEAS). This means that the funds and staff of the Commission who will be part of the EEAS will be included in the Commission's request. Subsequently, when the EEAS will be established and the relevant section of the budget created, the posts and appropriations should be transferred from the relevant sections of the Commission and the Council by the use of a letter of amendment related to the draft budget 2011.

        New budget procedure: the Draft Budget for 2011, as presented by the new Commission, marks the beginning of the first full budgetary procedure under the completely revised Lisbon Treaty provisions, on the basis of which a single reading of each arm of the budgetary authority will culminate in a Conciliation procedure in the autumn.

         

      title
      COM(2010)0300
      type
      Commission draft budget published
      celexid
      CELEX:52010DC0300:EN
    body
    type
    Commission draft budget published
  • date
    2010-04-27
    docs
    • url
      http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2010&nu_doc=0300
      text
      • PURPOSE: to present the draft budget of the Commission for the financial year 2011.

        CONTENT: the Commission adopted the first draft budget of the "Lisbon era" - the draft budget for the financial year 2011. It is also the fifth budget under the Financial Perspectives 2007-2013 whose main objective will be to boost economic recovery, invest in Europe's youth and in tomorrow's infrastructures.

        Budget details: out of a total of €142.6 billion, some €64.4 billion are geared towards economic recovery actions (+3.4% on 2010). Furthermore, the funds backing the flagship initiatives of the EU 2020 strategy (for growth) represent some €57.9 billion (some 40% of the Budget).

        For payment appropriations, the total amounts to €130 136,0 million, corresponding to 1.04 % of GNI. This is an increase of €7 179.1 million compared to payment appropriations in the 2010 budget, and leaves a margin of €4 429,0 million under the ceiling.

        The main budgetary priorities for 2011: the main objective in 2011 will fully support the European economic recovery, strengthening and improving growth prospects. The EU budget has two main priorities:

        1. Supporting the EU economy post-crisis: competitiveness for growth and employment, with €13.4 billion, and Cohesion for growth and employment, allocated with €51.0 billion, support the EU economy by reinforcing the conditions for future growth. Investments in research, development, and innovation, infrastructure and human capital are at the heart of economic modernisation and are reinforced through relevant key programmes. These actions are in line with the priority areas identified by the Europe 2020 strategy. In these key policy areas, the 2011 Draft Budget foresees significant increases in payment appropriations, delivering real implementation on the ground. In particular, increased payment levels for activities under Competitiveness for Growth and Employment and for Cohesion for growth and employment prove that these policies are implemented vigorously to accelerate the recovery process. Accompanied by actions in favour of education, training and lifelong learning, the European Microfinance facility and the support of programmes addressed to youth will contribute in consolidating our exit from the crisis and assist the younger generations. Reinforced payment levels for growth and employment are combined in the 2011 Draft Budget with stable funding levels for market related expenditure and direct aids under the Common Agricultural  Policy (CAP) as well as for rural development.
        2. Adapting to new requirements in the area of financial services and supervision: three new EU Authorities will assist national authorities in applying EU rules and link national supervisors into a strong EU network. The financial supervision authorities will be part of the European System of Financial Supervisors (ESFS). In addition, the financing of Global Monitoring for Environment and Security (GMES) begins in 2011 with the allocation of €10 million. This initiative provides better environmental monitoring and management, and increased security. The substantial increase foreseen for the area of Freedom, Security and Justice (heading 3a, + 12.8% in commitment appropriations and + 15.4% in payment appropriations), and in particular for Solidarity and management of migration flows, reflects the importance attached to the implementation of the recently adopted 'Stockholm programme' for which an Action Plan has been proposed by the Commission. Other new initiatives are preparatory actions on 'Mainstreaming climate action and adaptation' (heading 2), the 'European Year of Volunteering' (heading 3b on citizenship) and, under heading 4, the new 'European Voluntary Humanitarian Aid Corps'. Finally, the sustained level of commitment appropriations for the EU as a global player (heading 4) will allow the Union, reinforced by the new European External Action Service, to continue to play its role on the world stage, including in the area of climate action (additional commitment appropriations amounting to EUR 65 million) further to the Copenhagen Accord reached in December 2009.

        MAIN CHARACTERISTICS BY BUDGET HEADING: the presentation below is structured according to the budget categories of the financial framework 2007-2013:

        Heading 1: Sustainable Growth: this section includes expenditure related to competitiveness, employment and cohesion:

        • 1a Competitiveness for growth and employment: this sub-section brings together many of the flagship initiatives set out in the Europe 2020 strategy including 'innovation Union', 'youth on the move', 'resource efficiency Europe', 'new skills and jobs' and 'industrial policy for the globalisation era'. The main programmes of this heading are the 7th Framework Programme for research and technological development (FP7), the Lifelong Learning Programme, the Competitiveness and Innovation Programme (CIP), the Trans-European Networks (TENs), GALILEO/EGNOS and Marco Polo II, and the PROGRESS Programme. Other actions contributing to the goals of the priority themes of the Europe 2020 strategy concern the internal market, statistics, financial services and supervision, the fight against fraud, taxation and the customs union. Commitment appropriations for heading 1a are set at €13.436,9 million, which is a decrease of 9.6% compared to the 2010 budget. This leaves a margin of €50.1 million. Payment appropriations increase by 6.8 % to €12.109,7 million. The apparent reduction in commitment appropriations for this heading must be seen in the context of the inclusion in the 2010 budget of the second tranche of additional appropriations for the funding of energy projects to aid economic recovery, as mentioned above. Once this element is excluded, commitment and payment appropriations increase by 4.4% and 7.0 % respectively.
        • 1b Cohesion for growth and employment: the sub-section covers mainly the Structural Funds (ERDF, ESF and Cohesion Fund). The commitments included up 3.2% to €50.970,1 million, which leaves a margin of €16.9 million. The payment appropriations rise 16.9% to €42.540,8 million. The substantial increase in the level of payments reflects the momentum of the Cohesion Policy 2007-2013 on the ground, and hence its contribution to economic recovery in Europe. Because the management systems and controls are in place and that programmes are on track, further significant increases in annual payment needs are expected towards the end of the current programming period. Overall and by their nature, the Cohesion policy objectives contribute to the Europe 2020 strategy in terms of promoting smart greener and competitive growth of regional economies based on knowledge, innovation and resource efficiency.

        Heading 2: Preservation and management of natural resources: for 2011, the Commission proposes commitment appropriations amounting to €59.486.2 million for heading 2. This level of funding, stable compared to 2010, leaves a margin of €851.8 million under the ceiling. The margin increase compared to 2010 is due primarily to a decrease in interventions in agricultural markets (expected decline of approximately €900 million). The continuation of the progressive introduction of direct aid to the EU 12 countries as well as improving the situation on agricultural markets are the main factors behind this development. Payment appropriations amount to €58.136.7 million. The amount for market related expenditure and direct aid amounted to €43.747,4 million in commitment appropriations and €43.656,8 million in payments.

        Heading 3: Citizenship, freedom, security and justice: this section is divided into two sub-sections:

        • 3.a Freedom, Security and Justice: this sub-heading is devoted to activities in the area of freedom, security and justice. The year 2010 will correspond to an implementation consistent and reinforced by specific actions, grouped into three general programmess (Solidarity and Management of Migration Flows, Fundamental Rights and Justice and Security and Safeguarding Liberties). The PB provides a substantial increase in the sub-heading in the order of 12.8% to €1.135.3 million, so there remains a margin of €70.7 million. Payment appropriations are also subject to a significant increase of 15.4% to €852.4 million. It should be noted that the funds originally earmarked for the Information System (VIS) and the Schengen Information System (SIS) have been lower than originally forecast, totalling €60 million. Part of this allocation will be used to finance (up to €10.6 million) the new agency for the operational management of information systems to large scale.
        • 3.b Citizenship: this sub-heading contributes to numerous Europe 2020 strategy flagship initiatives including 'youth on the move', 'an agenda for new skills and jobs', 'European platform against poverty' and 'innovative Union'. In particular this heading covers issues which are of key concern to the citizens of Europe, including health, consumer protection, and civil protection. The crucial task of reaching out to the citizens and communicating Europe also fall within this heading, through the funding of cultural programmes and the policy area Communication. The commitment appropriations amounted to €667.8 million, leaving a margin of €15.2 million. Payment appropriations for this category fell by 3.1%, to €639 million. The annual limit for this section remains generally stable in the current financial framework. The Commission has deliberately kept a margin to account for unforeseen expenses and possible policy adjustments during budget procedure and, consequently, the level of commitments remain unchanged from 2010.

        Heading 4: EU as a global player: Heading 4 shows an increase of 5.6% in commitment appropriations to €8 613.5 million, leaving a margin of €70.3 million under the ceiling. Payment appropriations decreased by 2.4% to €7.601,8 million. In 2011, the implementation of almost all programmes should continue at cruising speed. Based on the financial framework 2007-2013, the PB 2011 continues to meet the overall profile of the multiannual financial envelope allocated to the respective instruments. The major action planned for 2011 is the further intensification of bilateral, regional and thematic EU programmes. Additional efforts to address the causes and consequences of climate change in third countries will be increasingly financed from funds committed for annual action plans of the geographic instruments. The following should also be noted: (a) the strengthening EU commitments at the forthcoming UN conference on Millennium Development Goals (€65 million); (b) strengthening the support provided by EU to efforts in developing countries to address climate change (€65 million); (c) a new framework to support the economic and social development of the Turkish Cypriot community (€25 million).

        Heading 5: Administration: commitments and payments increased by 4.4%, the first amounting to EUR 8255.4 million and the second to €8.256 million. Thus there remains a margin of €160.6 million. The Commission has made special efforts to reduce its administrative expenditure, which grew 2.9%, resulting partly from an increase in wages which were higher than expected in 2009. This moderate increase in administrative expenditure results also in the fact that the Commission is not requesting any additional posts. The Commission expects to achieve its priority objectives, including those arising from the entry into force of the Treaty of Lisbon by a major redevelopment effort. Section 5 also covers the administrative expenditure of other institutions based on their respective estimates. These estimates take into account the additional requirements associated with entry into force of the Lisbon Treaty, particularly as regards the Parliament, the European Council and the Council, the Economic and Social Committee and the Committee of Regions. The Commission's draft budget was established without prejudice to the creation of the European External Action Service (EEAS). This means that the funds and staff of the Commission who will be part of the EEAS will be included in the Commission's request. Subsequently, when the EEAS will be established and the relevant section of the budget created, the posts and appropriations should be transferred from the relevant sections of the Commission and the Council by the use of a letter of amendment related to the draft budget 2011.

        New budget procedure: the Draft Budget for 2011, as presented by the new Commission, marks the beginning of the first full budgetary procedure under the completely revised Lisbon Treaty provisions, on the basis of which a single reading of each arm of the budgetary authority will culminate in a Conciliation procedure in the autumn.

         

      title
      COM(2010)0300
      type
      Commission draft budget
      celexid
      CELEX:52010DC0300:EN
    body
    EC
    commission
    • DG
      Budget
      Commissioner
      LEWANDOWSKI Janusz
    type
    Commission draft budget
  • date
    2010-05-18
    body
    CSL
    type
    Council Meeting
    council
    Economic and Financial Affairs ECOFIN
    meeting_id
    3015
  • date
    2010-08-12
    docs
    • url
      http://register.consilium.europa.eu/servlet/driver?page=Result&lang=EN&typ=Advanced&cmsid=639&ff_COTE_DOCUMENT=12699%2F10&fc=REGAISEN&srm=25&md=100
      text
      • The Council adopted its position on the draft budget for 2011.

        The main features of the position are as follows:

        • Commitment appropriations: EUR 141 777.33 million;
        • Payment appropriations: EUR 126 527.13 million.

        Under the Council's position on the draft budget for 2011 adopted by the Council, commitment appropriations increase by 0.22 % compared to the 2010 budget and payment appropriations increase by 2.91 %.

        The total amount of payment appropriations provided for in the draft budget for 2011 corresponds to 1.02 % of EU GNI.

        A. General respects: when adopting its position on the draft budget for 2011, the Council followed a number of guidelines:

        • shows due regard to the Interinstitutional Agreement of 17 May 2006 on budgetary discipline and sound financial management;
        • is within the framework of the budget guidelines established for the 2011 budget in the Council conclusions adopted in March 20101.
        • to follow an approach leading to a budget that is realistic and comprehensively balanced, complying with budgetary discipline and sound financial management. While recognising the efforts already made by the Commission in its draft budget, the need of additional efforts was underlined;
        • to provide adequate funding for the European Union's various priorities, determining appropriations on the basis of the budget implementation rate in 2009, budget forecast alerts in 2010, realistic absorption capacities and performance information provided in the activity statements. This approach was also followed with regard to allocations for administrative expenditure arising from operational programmes and the expenditure of the executive agencies responsible for their management;
        • to ensure a limited and controlled growth of payment appropriations in comparison with 2010 under all headings and sub-headings of the financial framework, adjusting the amounts on the basis of an analysis of the 2009 budget implementation and the 2010 budget forecast alerts. This approach should be seen in the context of the budgetary constraints applied in all Member States. It also approved the following declaration on a specific procedure regarding payment appropriations under sub-heading 1b: "The Council urges the Commission to present by the end of September 2011 at the latest updated figures concerning the state of affairs and estimates regarding payment appropriations under sub-heading 1b (Cohesion for growth and employment) and, if necessary, to present a draft amending budget for this sole purpose;
        • to apply for decentralised agencies a similar approach as for the administrative expenditure of the institutions;
        • to leave adequate margins under the ceilings of the headings and subheadings of the financial framework, with the exception of subheading 1b, in order to be able to cope with unforeseen situations, while respecting the amounts in commitment appropriations proposed by the Commission regarding co-decided programmes.

        The following principles have also been respected:

        • respect for the nomenclature proposed in the DB;
        • creation of a new budget line for the preparatory action for the preservation of commemorative sites in Europe.

        B. Expenditure by main headings of the financial framework: as to expenditure under the different headings of the financial framework the Council's position leads to:

        Heading 1: Sustainable growth (EUR 64.361 billion in commitments):

        1.a) competitiveness for growth and employment expenditure: the amount of commitments is set at EUR 13.390 billion, that is a total reduction of EUR 46.55 million in the appropriations requested in the DB in respect of a number of specific budget lines under this heading, on the basis of past and current budget implementation and realistic absorption capacities. The financial envelope is characterised by the following:

        • fixing the level of the appropriations for subsidies for decentralised agencies, reducing the appropriations requested in the DB by a total of EUR 3.04 million as a result of the approach followed for these agencies. A total of 184 temporary posts for new agencies and agencies in charge of new tasks were accepted;
        • setting the level of payment appropriations, targeting a total reduction of EUR 891.14 million in the appropriations requested in the DB of which EUR 62.40 million in the field of competitiveness, EUR 121.80 million in the field of transports, EUR 545.97 million in the field of research, EUR 50 million on the budget line for the European Globalisation Adjustment Fund and EUR 110.97 million on various other budget lines, on the basis of an analysis of the 2009 budget implementation and the 2010 budget forecast alerts.

        The margin available under sub-heading 1a would be EUR 96.70 million.

        1.b) cohesion for growth and employment expenditure: the Council provides an amount of EUR 50.970 billion in commitments which is the same amount as the Commission's DB. It is also provided to set the level of payment appropriations, reducing the appropriations requested in the DB by a total of EUR 1 075 million while resulting in an increase of 13.97 % in comparison with 2010. This amount represents a reduction in payment appropriations concentrated in the field of the European Regional Development Fund (EUR 386 million), the European Social Fund (EUR 129 million), and the completion of the former programmes (EUR 560 million), representing a correction in budgeting on the basis of the available information. The Council also approved declarations on payment appropriations and on a specific procedure regarding payment appropriations under sub-heading 1b.

        The margin available under sub-heading 1b would be EUR 16.91 million.

        Heading 2: Preservation and management of natural resources:  the amount of this heading is set at EUR 59.011 billion in commitments, that is a total reduction of EUR 474.64 million in commitment  appropriations requested in the DB, of which EUR 38.75 million in the field of interventions in agricultural markets, EUR 420 million on the budget line for clearance of accounts and EUR 15.89 million on various other budget lines, on the basis of past and current budget implementation and taking into account the available information related to some specific agricultural areas. The Council has decided to:

        • fix the level of the appropriations for subsidies for decentralised agencies, reducing the appropriations requested in the DB by a total of EUR 0.46 million in commitments and EUR 0.31 million in payments
        • as a result of the approach followed for these agencies. One temporary post was accepted;
        • set the level of payment appropriations, reducing the appropriations requested in the DB by a total of EUR 820.71 million, of which EUR 38.75 million in the field of interventions in agricultural markets,EUR 420 million on the budget line for clearance of accounts, EUR 143 million in the field of Rural development, EUR 142.90 million in the field of European Fisheries Fund and EUR 76.06 million on various other budget lines, on the basis of past and current budget implementation.

        These amounts estimated on the basis of past budget implementation and available information may be reviewed in the light of the Autumn letter of amendment.

        The margin available under heading 2 would be EUR 1 326.40 million.

        Heading 3: Citizenship, freedom, security and justice: the amount for this heading is EUR EUR 1.792 billion in commitments, split into 2 sub-headings:

        3.a) freedom, security and justice expenditure (EUR 1.124 billion in commitments): for this sub-heading, the Council asks to:

        • set the level of commitment appropriations, reducing by a total of EUR 10.91 million commitment appropriations requested in the DB in respect of a number of specific budget lines under this heading, on the basis of past and current budget implementation;
        • fix the level of the appropriations for subsidies for decentralised agencies, reducing the appropriations requested in the DB by a total of EUR 8.36 million as a result of the approach followed for these agencies. A total of 90 temporary posts were accepted;
        • set the level of payment appropriations, targeting a total reduction of EUR 49.61 million in the appropriations requested in the DB on a number of budget lines on the basis of an analysis of the 2009 budget implementation and the 2010 budget forecast alerts.

        The margin available under sub-heading 3a would be EUR 81.66 million.

        3.b) citizenship expenditure (EUR 668 million in commitments), the Council aims to:

        • set the level of commitment appropriations, increasing by a total of EUR 0.16 million the commitment appropriations requested in the DB. This increase was the result on the one hand of slight reductions in respect of a number of specific budget lines under this heading on the basis of past and current budget implementation and on realistic absorption capacities and on the other hand of an increase of EUR 4 million for the financing of a preparatory action for the preservation of commemorative sites in Europe;
        • fix the level of the appropriations for subsidies for decentralised agencies, reducing the appropriations requested in the DB by a total of EUR 1.49 million in commitments as a result of the approach followed for these agencies;
        • set the level of payment appropriations, reducing by a total amount of EUR 19.30 million the appropriations requested in the DB in a targeted manner over a series of budget lines, on the basis of an analysis of the 2009 budget implementation and the 2010 budget forecast alerts.

        The available margin under sub-heading 3b would be EUR 15.02 million.

        Heading 4: the EU as a global player: the Council provides an overall amount of EUR 8.520 billion in commitments. It has also decided to:

        • set the level of commitment appropriations, reducing by a total amount of EUR 93.74 million the commitment appropriations requested in the DB on a number of specific budget lines under this heading, on the basis of past and current budget implementation and on realistic absorption capacities;
        • fix the level of the appropriations for subsidies for decentralised agencies, reducing the appropriations requested in the DB by a total of EUR 0.9 million as a result of the approach followed for these agencies;
        • set the level of payment appropriations, reducing by a total of EUR 590.90 million the appropriations requested in the DB, of which on the one hand EUR 387.90 million in a targeted manner over a series of budget lines, on the basis of an analysis of the 2009 budget implementation and the 2010 budget forecast alerts, and on the other hand not retaining the amount proposed in the DB of EUR 203 million regarding the Emergency Aid Reserve. The Council also approved a declaration on payment appropriations.

        The margin available under Heading 4 would be EUR 164.07 million to cover at a later stage additional needs.

        Heading 5: Administrative expenditure: amounts to EUR 8.093 billion in commitments. The Council has decided to:

        • limit the global increase of the administrative expenditure of the EU institutions, in line with the approach followed by the Member States for their national civil service;
        • set the administrative budget of each institution at the appropriate level, taking into account their specificities and real and justified needs;
        • carry out targeted reductions under certain budgetary lines for all the institutions, taking into account the 2009 budget outturn and real needs;
        • accept part of the appropriations related to the preparation of the accession of Croatia, on the basis of an accession in 2012;
        • not accept the 1.85 % increase linked to the adjustment of the 2009 salaries included by some institutions in their draft estimate, pending the decision of the Court of Justice;
        • increase the standard flat rate abatement on salaries for most of the institutions, taking into account their current vacancy rate;
        • not accept any new post requested by the institutions with the exception of the posts for the European Council which is a new institution;
        • accept requested conversions, transformations, upgradings and transfers of posts.

        Agencies: as regards decentralised agencies, the Council applied a similar approach as for the institutions. Therefore, the increase was limited to 1.5 % compared to 2010 for the agencies at "cruising speed" and to 3 % for the agencies in charge of "new tasks". For the latter, half of the new posts requested were accepted. For "new agencies", the requests were accepted without changes, except for the Agency for the operational management of large scale IT systems in the area of freedom, security and justice for which appropriations and posts are foreseen for 6 months.

        A margin of EUR 322.77 million remained available under the ceiling of heading 5 of the financial framework.

      type
      Council position on draft budget published
      title
      12699/2010
    body
    type
    Council position on draft budget published
  • date
    2010-08-12
    docs
    body
    CSL
    type
    Document attached to the procedure
  • date
    2010-09-15
    docs
    • url
      http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/sec/2010/1064/COM_SEC(2010)1064_EN.pdf
      text
      • PURPOSE: presentation of the amending letter No. 1 to the EU's Draft General Budget 2011 - Sections II (European Council and Council), III (Commission) and X (European External Action Service - EEAS).

        CONTENT: the Treaty of the European Union (TEU) provides for the creation of a European external action service (or EEAS) to support the High Representative for Foreign Affairs and Security Policy in fulfilling her mandate. The EEAS was formally created on 26 July 2010 with the adoption of Council Decision 2010/427/EU establishing the organisation and functioning of the European External Action Service.

        In order to become established, this new institution needs to have its own budget structure. However, the draft budget for 2011 was adopted without an EEAS section. This amending letter therefore proposes, in line with the amending budget No. 6/2010 to create for the EEAS, this new budget section, with corresponding expenditures, effective from 1 January 2011.

        The present amending letter provides the budgetary resources allowing a viable and efficient start-up in view of an autonomous EEAS as from 2011, by creating a fully-fledged budget section for the EEAS, while ensuring the smooth functioning and continuity of all ongoing activities.

        The EEAS will operate with the means transferred from the Commission and Council, which have been responsible for most of the tasks to be performed by the EEAS until now. This implies that this proposal does not only create the 2011 draft budget for the EEAS, but also amends the budget sections of the Commission and the Council.

        An efficient organisational structure within a context of fiscal consolidation:the establishment of the EEAS has to be guided by the principles of cost-efficiency, budget neutrality, and sound and efficient management, also taking into account the impact of the current economic crisis on national public finances and the required efforts for fiscal consolidation. Transitional arrangements and gradual build-up of capacity will have to be used in the setting up of this service. Upon their transfer to the EEAS, each official will be assigned to a post in the function group corresponding to his/her grade. In addition, the EEAS will be gradually staffed with diplomats from Member States (temporary agents) and support staff. Once it reaches cruising speed, staff originating from the national diplomatic services is expected to represent one third of all AD staff.

        Proposed budget for the EEAS in 2011: this proposal covers the transfer of staff and related appropriations from the budget sections of the Commission (Section III) and the Council (Section II) to the budget section of the EEAS (Section X). The budget sections of the Commission and the Council are reduced accordingly.

        The amending letter also includes the full-year cost related to the additional staff requested in draft amending budget 6/2010 (see BUD/2010/2094), an additional requests for 18 additional new posts at headquarters (EUR 2 million additional expenditure in 2011) and for upgraded security of the EEAS premises (EUR 3.275 million additional expenditure in 2011).

        The resulting administrative expenditure for the EEAS in 2011 amounts to EUR 475.8 million, of which EUR 184.9 million at headquarters (Titles 1 and 2 of the section X of the general budget) and EUR 290.9 million in delegations (Title 3).

        Staffing: the total number of posts in the establishment plan of the EEAS is 1 643: 1 114 posts are transferred from the Commission, 411 from the Council, 100 new posts requested in draft amending budget 6/2010, and 18 new posts requested in this amending letter. The additional 18 new post are requested at this stage to address the most urgent needs in relation to increased workload resulting from taking over tasks previously carried out by the rotating presidency and other tasks flowing from the Lisbon Treaty, and to consolidate the EEAS's capacity to function autonomously.

        In addition to the 1 643 posts in its own establishment plan, the EEAS will also have another estimated 2 077 full-time equivalent (FTE) human resources, including seconded national experts, contract agents, agency staff, and local agents (the latter only in delegations).

        The establishment plans of Section II (European Council and Council) and Section III (Commission) of the general budget are reduced by the number of posts transferred to the EEAS, i.e. 1 114 posts from the Commission and 411 posts from the Council. The related appropriations are transferred to the EEAS from the relevant budget lines in the Council and Commission budget which are reduced accordingly.

        Conclusion: this amending letter proposes amending Sections II (European Council and Council) and III (Commission) of the general budget to create a new section, Section X (European External Action Service) in the draft 2011 budget.

        The proposed establishment plan of the EEAS includes:

        • 1 643 posts, of which 1 114 are transferred from the Commission, 411 from the Council, + 100 new posts requested in draft amending budget 6/2010, and 18 additional new posts requested for 2011;
        • 2 077 full-time equivalent human resources, including seconded national experts, contract agents, agency staff, and local agents (the latter in delegations).

        The resulting administrative expenditure for the EEAS in 2011 amounts to EUR 475.8 million, of which

        • EUR 82.2 million transferred from Section II (European Council and Council),
        • EUR 359.2 million from Section III (Commission),
        • EUR 29.2 million requested as additional appropriations in relation to the full-year cost of the new human resources (100 new AD posts, 60 local agents in delegations and 10 contract agents at headquarters) requested in draft amending budget 6/2010,
        • EUR 5.2 million requested for 18 additional posts and strengthened security of the EEAS definitive premises in 2011.

        In total, amending letter 1/2011 provides for an increase to the 2011 budget of EUR 34, 461,399.

      type
      Document attached to the procedure
      title
      SEC(2010)1064
    body
    EC
    commission
    • DG
      Budget
      Commissioner
      LEWANDOWSKI Janusz
    type
    Document attached to the procedure
  • date
    2010-09-20
    body
    EP
    type
    Committee referral announced in Parliament, 1st reading/single reading
    committees
  • date
    2010-10-01
    docs
    • url
      http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE448.942
      type
      Committee draft report
      title
      PE448.942
    body
    EP
    type
    Committee draft report
  • date
    2010-10-07
    text
    • The Committee on Budgets adopted the report jointly drafted by Sidonia Elżbieta JĘDRZEJEWSKA (EPP, PL) - (Section III - Commission) and Helga TRÜPEL (Greens/EFA, DE) - (Other sections) on the Council's position on draft general budget of the European Union for the financial year 2011 - all sections as well as Letters of Amendment 1, 2 and 3/2011 to the EU 2011 draft general budget.

      Under Section III, the key issues and priorities for the 2011 budget may be summarised as follows:

      A new procedure and a high-level commitment: the committee is firmly convinced that the budgetary procedure under the new Treaty on the Functioning of the European Union (TFEU) requires full and high-level political involvement of all institutions concerned. It underlines that the conciliation procedure aims at reconciling the views of both branches of the budgetary authority and that the Joint Text on Budget 2011 will still have to be approved by both branches according to their own rules and Article 314(7) of the Treaty.

      Members consider the written procedure for the adoption of the Council's position to be particularly inappropriate for the budgetary procedure, and questionable in the absence of public and clear political endorsement by the Council at ministerial level of an essential piece of EU legislation.

      "Lisbonisation" of the budget: importantly, Members consider that the entry into force of the TFEU, which strengthens EU policies and creates new fields of competence - notably Common Foreign and Security Policy, competitiveness and innovation, space, tourism, the fight against climate change, social policy, energy policy, justice and home affairs - implies a "lisbonisation" of the budget and therefore requires both branches of the budgetary authority to be coherent and consistent as regards increased financial capacities.

      A tight budget: the committee recalls that, despite consecutive Treaty changes and increased responsibilities transferred at Union level, the EU budget amounts to a modest 1% of GNI. It opposes consequently the severe cuts adopted by the Council. The EU institutions are called upon to define a proper mechanism to evaluate and assess the "cost of non Europe" which would highlight the savings in national budgets generated by the pooling of resources.

      Although Members consider that savings are necessary, they consider arbitrary reductions in payments appropriations not to be in line with sound budgeting and that arbitrary reductions in commitments appropriations jeopardize the implementation of Union policies and programmes already agreed.

      However, MEPs understand the pressures on Member States' budgets and therefore broke with the tradition of suggesting a much larger budget than the Commission proposes, and increased it only very slightly. The committee agreed on a total of €130.14 billion in payments and €142.65 billion in commitments (compared to the Commission's €130.14 billion in payments and €142.56 billion in commitments).

      Moreover, the budget should be viewed not as an additional burden to national budgets, but rather as an opportunity to gear up national initiatives and investments to which it can add value.

      The report recalls that youth-, education- and mobility-related policies have been identified by Parliament as one of its most important priorities for the 2011 budget since they are essential and necessary parts of the EU strategy for the economic recovery and the Europe 2020 strategy.

      Members reiterate their firm conviction that the financing of EU policies should be closely monitored in order to avoid any expenditure which is not driven by a clear and identifiable objective. They emphasise that an overwhelming part of EU budget expenditures supports long-term investments necessary to stimulate EU economic growth.

      As regards the margins stemming from the Multiannual Financial Framework (MFF), Members state that these do not allow real room for manoeuvre, especially in subheadings 1a and 3b and heading 4, and reduce the capacity of the EU to react to policy changes and unforeseen needs while maintaining its priorities. They point out that the scope of the challenges the EU faces, would require means well beyond the current ceilings of the multiannual financial framework. They recall, in that respect, that a substantial budget review is absolutely needed and that an immediate revision of the ceilings of the current MFF as well as some provisions of the Interinstitutional Agreement of 17 May 2006 on budgetary discipline and sound financial management has been rendered unavoidable by the various challenges and new priorities that have arisen.

      The committee recalls that the financing of its priorities and of the new policies stemming from the entry into force of the Treaty could not have been rendered possible by the ceilings of the MFF. It stresses that, in order to ease the negotiation within the Conciliation Committee, it has, at the price of severe compromises, proposed the financing of these policies within the ceilings. Members points out, nevertheless, that this can only be managed through the decrease of appropriations on other, specific and carefully chosen, budget lines.

      Payment appropriations: as regards payment appropriations, the committee refuses to consider an overall figure of the Council's position as a final target arrived at by decreasing or increasing expenditure on different lines without in-depth assessments of the real needs. It recalls that this practice of the Council may impact on the execution rate for commitments for the same year, by slowing down the rate of signing new contracts, especially in the final quarter, therefore disturbing multiannual life cycles of the EU programmes.

      New own resources: Members also wants to start talks with the Council and the Commission about new sources of income for the EU. It therefore added two new lines to the 2011 budget. One line asks the Council to open the negotiations on new own resources, adding that this element is a full part of the overall agreement on the 2011 budget. The other budget line asks the Council and the Commission to decide on mechanisms to facilitate the transfer of unused appropriations of year N in particular in the context of the revision of the Financial Regulations. Until now, money that is not used has been paid back to the Member States at the end of the year. The budget lines do not contain any figures.

      Lastly, Members state that administrative expenditure supporting EU programmes should not be cut. Therefore, they restore all of the Council's cuts in respect of the administrative management lines of those programmes.

      On the other Sections of the EU budget, the report outlines the minor changes regarding the creation of new posts as a consequence of the Lisbon Treaty.

    body
    EP
    committees
    type
    Vote in committee, 1st reading/single reading
  • date
    2010-10-11
    docs
    • url
      http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2010-0284&language=EN
      type
      Budgetary report tabled for plenary, 1st reading
      title
      A7-0284/2010
    body
    type
    Budgetary report tabled for plenary, 1st reading
  • date
    2010-10-11
    docs
    • url
      http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2010-0284&language=EN
      type
      Budgetary report tabled for plenary, 1st reading
      title
      A7-0284/2010
    body
    EP
    type
    Budgetary report tabled for plenary, 1st reading
  • date
    2010-10-11
    docs
    • url
      http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/sec/2010/1199/COM_SEC(2010)1199_EN.pdf
      text
      • PURPOSE: presentation of amending budget N° 2 to the draft general budget 2011 for the EU - Section III - Commission.

        CONTENT: the Amending Letter No 2 (AL 2) to the Draft Budget for 2011 (DB 2011) covers the following:

        • a reinforcement of the EU contribution to Europol by EUR 552 000, as well as modifications to the establishment plan of Europol, reflecting a request for four additional establishment plan posts (all AD posts);
        • a reinforcement of the EU contribution to the three Financial Supervision Authorities (EBA, EIOPA and ESMA) by EUR 1 224 000, as well as modifications to the establishment plans of the Authorities, reflecting a request for six additional establishment plan posts for EBA (of which 3 AD posts and 3 AST posts), six additional establishment plan posts for EIOPA (of which 5 AD posts and 1 AST post), and fifteen additional establishment plan posts for ESMA (of which 10 AD posts and 5 AST posts);
        • the creation of a new budget item 01 04 01 03 for the guarantee provided by the European Union in accordance with the provisions of Article 122(2) of the Treaty on the Functioning of the European Union (TFEU) and, correspondingly, a new article 802 on the revenue side. This has no budgetary implications.

        The net financial impact of this amending letter is EUR 1 776 000, both in commitment appropriations and payment appropriations.

      type
      Document attached to the procedure
      title
      SEC(2010)1199
    body
    EC
    commission
    • DG
      Budget
      Commissioner
      LEWANDOWSKI Janusz
    type
    Document attached to the procedure
  • date
    2010-10-15
    docs
    • url
      http://www.europarl.europa.eu/sides/getDoc.do?type=JOINT-TEXT&mode=XML&reference=C7-2010-0333&language=EN
      text
      • On 15 September 2010, the Commission submitted to the Council letter of amendment No 1 to the draft budget (DB) for 2011. This concerns expenditure in Section II (European Council and Council), Section III (Commission) and new Section X (European External Action Service (EEAS)) of the EU budget and modifications to the corresponding establishment plans.

        It relates to the creation of Section X (EEAS) in the DB 2011 with the appropriate budgetary structure and establishment plan.

        The proposed expenditure amounts to EUR 475.80 million in c/a and p/a (of which EUR 82.15 million transferred from Section II, EUR 359.19 million from Section III, and EUR 34.46 million additional expenditure compared to the DB 2011). The establishment plan of Section X (EEAS) shall include the posts transferred from other institutions (411 posts transferred from Section II and 1 114 posts from Section III), as well as the creation of 118 additional posts compared to the DB 2011 (100 of these 118 additional posts were already accepted by the Council in its position on draft amending budget No 6/2010).

        At the end of its examination, the Council agreed on its position on this letter of amendment. Letter of amendment No 1 to the DB 2011 as presented by the Commission is modified in order to take into account the Council's position on DB 2011. The total expenditure in new Section X (EEAS) will thus amount to EUR 469.85 million, by including:

        • the reduction in c/a and p/a (-EUR 5.60 million) already made in the Council's position on DB 2011 in Section II and Section III. In compensation, an equal reduction of the amounts to be transferred from Section II (-EUR 2.50 million) and Section III (-EUR 3.10 million), both in c/a and p/a, is made;
        • a further reduction in c/a and p/a related to 118 additional posts (for a total amount of EUR 0.35 million) as the Council did not accept to include the 1.85 % increase linked to the adjustment of the 2009 salaries, pending the decision of the Court of Justice.

        Council also agreed on the following Council statement on budget neutrality of the EEAS: the concept of budget neutrality should be seen in the context of resources within the EU budget, including when deciding on any new premises. It expects a report on an efficiency savings/redeployment plan early in 2011 outlining concrete steps to be taken in the short- as well as medium-term to progress towards budget neutrality.

        The Council adopted its position on letter of amendment No 1 to the draft budget for the financial year 2011 on the basis of the aforementioned elements and as set out in the technical annex to this explanatory memorandum (see Council Doc 15000/10 ADD 1).

      type
      Amending/supplementary letter on draft budget
      title
      15000/2010
    body
    CSL
    type
    Amending/supplementary letter on draft budget
  • date
    2010-10-19
    body
    EP
    type
    Debate in Parliament
  • date
    2010-10-20
    docs
    body
    EP
    type
    Budgetary text adopted by Parliament
  • date
    2010-10-20
    docs
    • url
      http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2010&nu_doc=0601
      text
      • PURPOSE: presentation of a Letter of Amendment No 3 to the Draft General Budget 2011 - Section III (Commission).

        CONTENT: the Amending Letter No 3 (AL 3) to the Draft Budget for 2011 (DB 2011) covers the following:

        • the line by line updating of the estimated needs for agricultural expenditure. In addition to changing market factors, the AL also incorporates legislative decisions adopted in the agricultural sector since the DB 2011 was drawn up, revised estimates of needs for some direct payments, as well as any proposals, which are expected to have effect during the coming budget year. Commitment and payment appropriations are decreased by EUR 346 million;
        • an update of the situation for International Fisheries Agreements, decreasing commitment appropriations by EUR 1 million;
        • the creation of a new budget item 32 04 14 04 - Energy projects to aid economic recovery - Energy efficiency and renewable initiatives.

        Updating agricultural needs: the purpose of the AL 3 is to ensure that the agricultural budget is based on the most up-todate economic data and legislative framework. As in the past, the Commission has carefully reviewed all its estimates of agricultural expenditure line by line. As well as taking into account market factors, this AL 3 also incorporates any legislative decisions adopted in the agricultural sector since the DB was drawn up, as well as proposals made by the Commission. The Commission concludes that:

        • EAGF appropriations are decreased by EUR 346 million. This is mostly due to lower needs in chapter 05 02 Intervention in Agricultural markets (- EUR 136 million) and to a modification in the level of EAGF assigned revenue available in 2011. Firstly, additional assigned revenue received in 2010 amounting to EUR 210 million will be carried over from 2010 to 2011. Secondly, the Commission expects some increase in the assigned revenue generated in 2011 (+ EUR 19 million), so that the total increase in available assigned revenue is EUR 229 million;
        • total commitment appropriations requested for agricultural expenditure financed by the EAGF are EUR 43 401 million, lower than in the DB 2011 (- EUR 346 million), resulting in a margin under the EAGF sub-ceiling which is now EUR 1 065 million. The new margin for heading 2 in total is EUR 1 199 million.

        Energy projects: in May 2010, the Commission proposed an amendment to Regulation (EC) 663/2009 to use the uncommitted funds under Chapter II of the EERP Regulation for the creation of a dedicated financial instrument to support energy efficiency and renewable initiatives. The financial facility shall support the development of bankable energy efficiency and renewable energy projects and facilitate the financing of investments in energy efficiency and renewable energy, in particular in urban settings. In compliance with the EERP Regulation, the facility should be limited to the financing of measures that have a rapid, measurable and substantial impact on economic recovery within the EU, increased energy security and reduction of greenhouse gas emissions. Therefore, the Commission proposes the creation of a new budget item 32 04 14 04 - Energy projects to aid economic recovery - Energy efficiency and renewable initiatives. The budget item is created under the new Title 32 "Energy". The creation of the same budget item is proposed in Amending Budget 10/2010 under Title 6 "Energy and Transport as line 06 04 14 04.

        Conclusion: on a budgetary note, the consequences of the AL 3/2011 is characterised by a decrease of EUR 347.2 million in commitment appropriations and a decrease of EUR 346.2 in payment appropriations.  

      title
      COM(2010)0601
      type
      Document attached to the procedure
      celexid
      CELEX:52010DC0601:EN
    body
    EC
    commission
    • DG
      Budget
      Commissioner
      LEWANDOWSKI Janusz
    type
    Document attached to the procedure
  • date
    2010-10-25
    body
    type
    Start of budgetary conciliation (Parliament and Council)
  • body
    CSL
    meeting_id
    3040
    text
    • The Council decided not to approve all amendments to its position on the draft budget for 2011 voted by the European Parliament.

      In accordance with Article 314 of the Treaty on the Functioning of the EU, a conciliation committee will now be convened in order to agree on a joint text within 21 days.

    council
    General Affairs
    date
    2010-10-25
    type
    Council Meeting
  • date
    2010-11-15
    body
    type
    Agreement not reached in budgetary conciliation
    text
    • The 2011 draft budget - the first to be negotiated under the new arrangements put in place by the Lisbon Treaty - was presented by the Commission on 27 April 2010. It was transmitted in all official languages on 15 June 2010. 

      The Council completed its reading of the draft budget and adopted its position on 12 August 2010, making cuts to the Commission's proposals. The European Parliament then held its vote on the Council's position on the draft budget on 20 October 2010. As Parliament adopted amendments to the draft budget which could not be accepted by the Council, a Conciliation Committee was convened, in accordance with Article 314, paragraph 4(c) of the Treaty on the Functioning of the European Union (TFEU).

      The Conciliation Committee worked over a period of 21 days, between 26 October 2010 and 15 November 2010. However, it was finally not possible to reconcile the positions of Parliament and Council within the time period allowed. Following the failure of the conciliation negotiations, the Commission was required to submit a new draft budget, in accordance with Article 314, paragraph 8 of the TFEU. This procedure file has now lapsed and the new draft budget is the subject of a separate new procedure file (see BUD/2010/2290).

      .

committees added
  • body
    EP
    responsible
    False
    committee
    AFCO
    date
    2010-02-22
    committee_full
    Constitutional Affairs
    rapporteur
    • group
      EPP
      name
      SAUDARGAS Algirdas
  • body
    EP
    responsible
    False
    committee
    AFET
    date
    2010-01-21
    committee_full
    Foreign Affairs
    rapporteur
    • group
      EPP
      name
      SALAFRANCA SÁNCHEZ-NEYRA José Ignacio
  • body
    EP
    responsible
    False
    committee
    AGRI
    date
    2009-11-09
    committee_full
    Agriculture and Rural Development
    rapporteur
    • group
      EPP
      name
      MCGUINNESS Mairead
  • body
    EP
    responsible
    True
    committee_full
    Budgetary Conciliation Committee
    committee
    BUDG
  • body
    EP
    responsible
    True
    committee
    BUDG
    date
    committee_full
    Budgets
    rapporteur
  • body
    EP
    responsible
    False
    committee
    CONT
    date
    2010-02-09
    committee_full
    Budgetary Control
    rapporteur
    • group
      S&D
      name
      LIBERADZKI Bogusław
  • body
    EP
    responsible
    False
    committee
    CULT
    date
    2010-01-25
    committee_full
    Culture and Education
    rapporteur
    • group
      ALDE
      name
      LØKKEGAARD Morten
  • body
    EP
    responsible
    False
    committee
    DEVE
    date
    2010-02-04
    committee_full
    Development
    rapporteur
    • group
      S&D
      name
      BERMAN Thijs
  • body
    EP
    responsible
    False
    committee
    ECON
    date
    2010-02-10
    committee_full
    Economic and Monetary Affairs
    rapporteur
    • group
      EPP
      name
      SCHWAB Andreas
  • body
    EP
    responsible
    False
    committee
    EMPL
    date
    2009-10-06
    committee_full
    Employment and Social Affairs
    rapporteur
    • group
      S&D
      name
      BERÈS Pervenche
  • body
    EP
    responsible
    False
    committee_full
    Environment, Public Health and Food Safety
    committee
    ENVI
  • body
    EP
    responsible
    False
    committee_full
    Women’s Rights and Gender Equality
    committee
    FEMM
  • body
    EP
    responsible
    False
    committee_full
    Internal Market and Consumer Protection
    committee
    IMCO
  • body
    EP
    responsible
    False
    committee
    INTA
    date
    2010-01-27
    committee_full
    International Trade
    rapporteur
    • group
      EPP
      name
      ŠŤASTNÝ Peter
  • body
    EP
    responsible
    False
    committee
    ITRE
    date
    2010-03-01
    committee_full
    Industry, Research and Energy
    rapporteur
    • group
      S&D
      name
      HERCZOG Edit
  • body
    EP
    responsible
    False
    committee_full
    Legal Affairs
    committee
    JURI
  • body
    EP
    responsible
    False
    committee
    LIBE
    date
    2010-05-03
    committee_full
    Civil Liberties, Justice and Home Affairs
    rapporteur
    • group
      S&D
      name
      LÓPEZ AGUILAR Juan Fernando
  • body
    EP
    responsible
    False
    committee_full
    Fisheries
    committee
    PECH
  • body
    EP
    responsible
    False
    committee_full
    Petitions
    committee
    PETI
  • body
    EP
    responsible
    False
    committee
    REGI
    date
    2010-02-22
    committee_full
    Regional Development
    rapporteur
    • group
      EPP
      name
      SURJÁN László
  • body
    EP
    responsible
    False
    committee_full
    Transport and Tourism
    committee
    TRAN
links added
other added
  • body
    EC
    dg
    Budget
    commissioner
    LEWANDOWSKI Janusz
procedure added
dossier_of_the_committee
BUDG/7/01917; BUDE/7/04374
reference
2010/2001(BUD)
title
2011 budget: all sections, first version
stage_reached
Procedure lapsed or withdrawn
subtype
Budget
type
BUD - Budgetary procedure
subject
  • 8.70.12 2011 budget