2010/0002(BUD)

Mobilisation of the European Globalisation Adjustment Fund: redundancies in buildings construction industry in Lithuania

Procedure completed

2010/0002(BUD) Mobilisation of the European Globalisation Adjustment Fund: redundancies in buildings construction industry in Lithuania
RoleCommitteeRapporteurShadows
Lead BUDG BÖGE Reimer (EPP)
Opinion EMPL
Lead committee dossier: BUDG/7/02161
Subjects
Links

Activites

  • 2010/04/08 Final act published in Official Journal
  • 2010/03/09 Budgetary text adopted by Parliament
    • T7-0044/2010 summary
    • Results of vote in Parliament
  • 2010/03/08 Draft budget approved by Council
  • #3000
  • 2010/03/08 Council Meeting
  • 2010/02/25 Budgetary report tabled for plenary, 1st reading
  • 2010/02/25 Budgetary report tabled for plenary, 1st reading
  • 2010/02/23 Vote in committee, 1st reading/single reading
  • 2010/02/18 Committee draft report
  • 2010/02/08 Committee referral announced in Parliament, 1st reading/single reading
  • 2010/01/22 Non-legislative basic document published
    • COM(2010)0009 summary
  • 2010/01/22 Date
  • 2010/01/22 Non-legislative basic document
    • COM(2010)0009 summary
    • DG Budget, LEWANDOWSKI Janusz
  • 2010/01/18 Document attached to the procedure
    • SEC(2010)0021 summary
    • DG Budget, LEWANDOWSKI Janusz

Documents

History

(these mark the time of scraping, not the official date of the change)

2012-02-09
activities added
  • date
    2010-01-18
    docs
    • url
      http://www.europarl.europa.eu/registre/docs_autres_institutions/commission_europeenne/sec/2010/0021/COM_SEC(2010)0021_EN.pdf
      text
      • In this document, the Commission gives a detailed analysis of the reasons for which it is proposing the mobilisation of the European Globalisation Adjustment Fund in favour of Lithuania.

        The Lithuanian application relates to 1 612 redundancies in the buildings construction industry during the reference period of nine months between 16 October 2008 and 15 July 2009. In order to establish the link between the redundancies and the financial and economic crisis, Lithuania argues that the global economic and financial crisis has had a serious impact on construction demand and activity in Lithuania, as well as severely reducing the industry's access to financial credits. As a result, the volume of construction activity in Lithuania has decreased. The slow-down in construction activity in Lithuania in the first quarter of 2009 was the worst in any of the EU-27 Member States.

        These steep drops in construction activity are consistent with trends seen elsewhere in the EU, where the industry has suffered declines of 2.9 % in 2008 and 11.5% in the first quarter of 2009 compared with the corresponding periods of the previous year.

        The Commission's assessment leads it to conclude that it will approve application EGF/2009/017 LT/Construction of buildings submitted by Lithuania, relating to the 1612 redundancies in the buildings construction industry, as evidence of a direct and demonstrable link has been provided that these redundancies result from the global economic and financial crisis. A co-ordinated package of eligible personalised services has been proposed. It is proposed to deploy EUR 1 118 893 from the EGF for application EGF/2009/017 LT/Construction of buildings.

      type
      Document attached to the procedure
      title
      SEC(2010)0021
    body
    EC
    commission
    • DG
      Budget
      Commissioner
      LEWANDOWSKI Janusz
    type
    Document attached to the procedure
  • date
    2010-01-22
    docs
    • url
      http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2010&nu_doc=0009
      text
      • PURPOSE: to mobilise the European Globalisation Adjustment Fund in respect of redundancies in the construction sector in Lithuania.

        PROPOSED ACT: Decision of the European Parliament and of the Council.

        CONTENT: Regulation EC N° 1927/2006 established the European Globalisation Adjustment Fund (EGF) to provide additional support to redundant workers who suffer from the consequences of major structural changes in world trade patterns and to assist them with their reintegration into the labour market. This Regulation has been last amended by Regulation (EC) N° 546/2009 which temporarily broadens the scope for application of EGF and modifies the eligibility criteria. The amended Regulation is applicable for applications received from 1 May 2009. The Interinstitutional Agreement of 17 May 2006 allows the mobilisation of the EGF within the annual ceiling of EUR 500 million. The Commission has carried out a thorough examination of the application submitted by Lithuania and it has made the following decision:

        Lithuania: Case EGF/2009/017 LT/Construction of buildings: Lithuania submitted the application to the Commission on 23 September 2009. It was based upon the specific intervention criteria Article 2(b) of Regulation (EC) No 1927/2006 which requires at least 500 redundancies to occur within a nine-month period of reference in a NACE 2 division in one region or two contiguous regions at NUTS II level, and was submitted within the deadline of 10 weeks referred to in

        Article 5 of that Regulation. The application concerns 1 612 redundancies in 128 enterprises in the construction sector.

        IMPACT ASSESSMENT: none.

        FINANCIAL IMPLICATIONS: the total annual budget available for the EGF is EUR 500 million. An amount of EUR 7 119 592 has already been mobilised for prior applications in 2010 leaving an amount of EUR 492 880 408 available. On the basis of the application for support from the Fund submitted by Lithuania, the contribution from EGF to the coordinated package of personalised services to be funded is of EUR 1 118 893, representing 65% of the total cost.

        Considering the maximum possible amount of a contribution from the Fund, the Commission proposes to deploy the EGF for this amount, to be allocated under heading 1a of the financial framework.

        By presenting this proposal to deploy the Fund, the Commission initiates the simplified trialogue procedure, as required by Point 28 of the Inter-institutional Agreement of 17 May 2006, in view of securing the agreement of the two arms of the budgetary authority on the need to use the Fund and the amount required. The Commission invites the first of the two arms of the Budgetary Authority that reaches agreement on the draft mobilisation proposal, at appropriate political level, to inform the other arm and the Commission of its intentions.

      title
      COM(2010)0009
      type
      Non-legislative basic document published
      celexid
      CELEX:52010PC0009:EN
    body
    type
    Non-legislative basic document published
  • body
    EP
    date
    2010-01-22
    type
    Date
  • date
    2010-01-22
    docs
    • url
      http://eur-lex.europa.eu/smartapi/cgi/sga_doc?smartapi!celexplus!prod!DocNumber&lg=EN&type_doc=COMfinal&an_doc=2010&nu_doc=0009
      text
      • PURPOSE: to mobilise the European Globalisation Adjustment Fund in respect of redundancies in the construction sector in Lithuania.

        PROPOSED ACT: Decision of the European Parliament and of the Council.

        CONTENT: Regulation EC N° 1927/2006 established the European Globalisation Adjustment Fund (EGF) to provide additional support to redundant workers who suffer from the consequences of major structural changes in world trade patterns and to assist them with their reintegration into the labour market. This Regulation has been last amended by Regulation (EC) N° 546/2009 which temporarily broadens the scope for application of EGF and modifies the eligibility criteria. The amended Regulation is applicable for applications received from 1 May 2009. The Interinstitutional Agreement of 17 May 2006 allows the mobilisation of the EGF within the annual ceiling of EUR 500 million. The Commission has carried out a thorough examination of the application submitted by Lithuania and it has made the following decision:

        Lithuania: Case EGF/2009/017 LT/Construction of buildings: Lithuania submitted the application to the Commission on 23 September 2009. It was based upon the specific intervention criteria Article 2(b) of Regulation (EC) No 1927/2006 which requires at least 500 redundancies to occur within a nine-month period of reference in a NACE 2 division in one region or two contiguous regions at NUTS II level, and was submitted within the deadline of 10 weeks referred to in

        Article 5 of that Regulation. The application concerns 1 612 redundancies in 128 enterprises in the construction sector.

        IMPACT ASSESSMENT: none.

        FINANCIAL IMPLICATIONS: the total annual budget available for the EGF is EUR 500 million. An amount of EUR 7 119 592 has already been mobilised for prior applications in 2010 leaving an amount of EUR 492 880 408 available. On the basis of the application for support from the Fund submitted by Lithuania, the contribution from EGF to the coordinated package of personalised services to be funded is of EUR 1 118 893, representing 65% of the total cost.

        Considering the maximum possible amount of a contribution from the Fund, the Commission proposes to deploy the EGF for this amount, to be allocated under heading 1a of the financial framework.

        By presenting this proposal to deploy the Fund, the Commission initiates the simplified trialogue procedure, as required by Point 28 of the Inter-institutional Agreement of 17 May 2006, in view of securing the agreement of the two arms of the budgetary authority on the need to use the Fund and the amount required. The Commission invites the first of the two arms of the Budgetary Authority that reaches agreement on the draft mobilisation proposal, at appropriate political level, to inform the other arm and the Commission of its intentions.

      title
      COM(2010)0009
      type
      Non-legislative basic document
      celexid
      CELEX:52010PC0009:EN
    body
    EC
    commission
    • DG
      Budget
      Commissioner
      LEWANDOWSKI Janusz
    type
    Non-legislative basic document
  • date
    2010-02-08
    body
    EP
    type
    Committee referral announced in Parliament, 1st reading/single reading
    committees
  • date
    2010-02-18
    docs
    • url
      http://www.europarl.europa.eu/sides/getDoc.do?type=COMPARL&mode=XML&language=EN&reference=PE438.421
      type
      Committee draft report
      title
      PE438.421
    body
    EP
    type
    Committee draft report
  • date
    2010-02-23
    text
    • The Committee on Budgets adopted the report by Reimer BÖGE (EPP, DE) on the proposal for a decision of the European Parliament and of the Council on the mobilisation of the European Globalisation Adjustment Fund (EGF) for a total amount of EUR 1 118 893 in commitment and payment appropriations to assist Lithuania in respect of redundancies in the construction sector.

      MEPs recall that the European Union set up the appropriate legislative and budgetary instruments to provide additional support to workers who suffer from the consequences of major structural changes in world trade patterns and to assist their reintegration into the labour market.

      Given that Lithuania requested assistance from the EGF in respect of cases concerning redundancies in 128 enterprises operating in the construction sector and this application fulfils the eligibility criteria set up by the EGF Regulation, MEPs request the institutions involved to make the necessary efforts to accelerate the mobilisation of the EGF for the requested amount.

      MEPs recall the institutions' commitment to ensure a smooth and rapid procedure for the adoption of the decisions on the mobilisation of the EGF, providing one-off, time-limited individual support geared to helping workers who have suffered redundancies as a result of globalisation. They stress that the European Union should use all its means to face the consequences of the global economic and financial crisis and that in this context, the EGF can play a crucial role in the reintegration of the workers made redundant into the labour market.

      In addition, MEPs recall that:

      • the EGF should support the reintegration of the individual redundant workers into employment and that assistance from the EGF shall not replace actions which are the responsibility of companies by virtue of national law or collective agreements, nor measures restructuring companies or sectors;
      • in the context of mobilising the EGF, the Commission should not systematically transfer payment appropriations from the ESF, since the EGF was created as a separate specific instrument with its own objectives and deadlines;
      • the functioning and the added value of the EGF should be evaluated in the context of the general assessment of the programmes and other various instruments created by the IIA of 17 May 2006, within the process of the 2007-2013 multiannual financial framework mid-term review.

      Furthermore, MEPs call on the Commission to include, in proposals for the mobilisation of the EGF, as well as in its annual reports, precise information on the complementary funding received from the European Social Fund (ESF) and other Structural Funds.

      Lastly, they note that the new Commission's proposals for a decision on the mobilisation of the EGF refer to a sole Member State's application, which is in line with European Parliament requests.

    body
    EP
    committees
    type
    Vote in committee, 1st reading/single reading
  • date
    2010-02-25
    docs
    • url
      http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2010-0019&language=EN
      type
      Budgetary report tabled for plenary, 1st reading
      title
      A7-0019/2010
    body
    type
    Budgetary report tabled for plenary, 1st reading
  • date
    2010-02-25
    docs
    • url
      http://www.europarl.europa.eu/sides/getDoc.do?type=REPORT&mode=XML&reference=A7-2010-0019&language=EN
      type
      Budgetary report tabled for plenary, 1st reading
      title
      A7-0019/2010
    body
    EP
    type
    Budgetary report tabled for plenary, 1st reading
  • date
    2010-03-08
    body
    type
    Draft budget approved by Council
  • date
    2010-03-08
    body
    CSL
    type
    Council Meeting
    council
    Employment, Social Policy, Health and Consumer Affairs
    meeting_id
    3000
  • date
    2010-03-09
    docs
    body
    EP
    type
    Budgetary text adopted by Parliament
  • date
    2010-04-08
    text
    • PURPOSE: to mobilise the European Globalisation Fund (EGF) in respect of redundancies in the Lithuanian construction industry.

      LEGISLATIVE ACT: Decision 2010/200/EU of the European Parliament and of the Council on the mobilisation of the European Globalisation Adjustment Fund, in accordance with point 28 of the Interinstitutional Agreement of 17 May 2006 between the European Parliament, the Council and the Commission on budgetary discipline and sound financial management.

      CONTENT: by this decision, the European Parliament and the Council have decided that for the general budget of the European Union for the financial year 2010, the European Globalisation Adjustment Fund shall be mobilised to provide the sum of EUR 1 118 893 in commitment and payment appropriations.

      Given that this application complies with the requirements for determining the financial contributions as laid down in Article 10 of Regulation (EC) No 1927/2006 (EGF), Parliament and Council have agreed that the abovementioned amount should be granted to Lithuania to meet its request.

      To recall, the European Globalisation Adjustment Fund (EGF) aims to provide additional support to redundant workers who suffer from the consequences of major structural changes in world trade patterns and to assist them with their reintegration into the labour market. The Interinstitutional Agreement of 17 May 2006 on budgetary discipline allows for the mobilisation of the Fund through a flexibility mechanism, within the annual ceiling of EUR 500 million. It should also be noted that the scope of the Fund's application was extended as of 1 May 2009 to include assistance to workers made redundant as a result of the global economic and financial crisis.

    type
    Final act published in Official Journal
    docs
committees added
  • body
    EP
    responsible
    True
    committee
    BUDG
    date
    2010-01-27
    committee_full
    Budgets
    rapporteur
    • group
      EPP
      name
      BÖGE Reimer
  • body
    EP
    responsible
    False
    committee_full
    Employment and Social Affairs
    committee
    EMPL
links added
other added
  • body
    EC
    dg
    Budget
    commissioner
    LEWANDOWSKI Janusz
procedure added
dossier_of_the_committee
BUDG/7/02161
reference
2010/0002(BUD)
title
Mobilisation of the European Globalisation Adjustment Fund: redundancies in buildings construction industry in Lithuania
geographical_area
  • Lithuania
stage_reached
Procedure completed
subtype
Mobilisation of funds
type
BUD - Budgetary procedure
final
subject

code AGPLv3.0+, data ODBLv1.0, site-content CC-By-Sa-3.0